background image

755796-100 Rev. 1 8/19

Product names listed herein are trademarks of AS America Inc.   
© AS America Inc. 2019

INSTALLATION INSTRUCTIONS

Passage

Shower Subway Tile Wall Collection

 

Nominal Dimensions: 60 x 32 x 72

Model: P2969SWT

Visit http://www.americanstandard-us.com/passage-collection 

for coordinating products.

Thank you for selecting American Standard – the benchmark of fine quality for over 100 years.  

To ensure this product is installed properly, please read these instructions carefully before you begin.  
Certain installations may require professional help.

American Standard Passage Shower Walls are designed to be installed together with the American Standard Passage 

Shower Base. If your specific installation does not include a Passage Shower Base, you will need to adjust the width of your 

shower alcove to 59-1/4" (1505 mm) to ensure correct fit with installed substrate (see Illustration 1).

REQUIRED TOOLS AND MATERIALS

TOOLS:

Tape Measure 

Drill

Caulking Gun 

Level

Masking Tape 

Square

Hole Saw 

Pencil

Jig Saw with fine tooth blade

MATERIALS:

Suction Cups - optional

SOLD SEPARATELY:

x8 Tubes Waterproof Instant Grab   

     Construction Adhesive
x2 Tubes Tub & Tile Sealant

BEFORE YOU BEGIN....
Local building codes vary by location. Observe all local plumbing and building codes.

Unpack your new shower walls and inspect them carefully for damage. Verify that the walls are the correct size for your installation. 

NOTE: Take extra care in handling the front surfaces of the walls. Use only non-abrasive cloths to avoid scratching.

STEP 1: PREPARATION

        Do not install directly to studs.  

 

Passage Shower Walls must be installed over a solid, water resistant substrate such as greenboard.

  

If alcove opening is larger than rough-in opening (see Illustration 1) there will be a visible gap between 

rear corners. Fir-out studding if necessary before installing substrate to provide correct alcove opening for 

panels. Ensure alcove is plumb and square.

1)   ROUGH PLUMBING & FITTINGS MUST  

BE INSTALLED BEFORE WALLS

 

2)   WALL SURFACE PREPARATION

   Ensure wall surface is dry, smooth, and free of dust, soap  
  scum, mold or other contaminants. Wipe wall surfaces  
  with a damp cloth and allow to dry.
 

TIP:  Priming wall substrate improves shower  

wall adhesion.

 Wall surface must be dry before  

panels can be applied.

NOTE:  IF YOU PLAN TO INSTALL A SHOWER DOOR 

 Follow manufacturer’s instructions and prepare  
stud wall accordingly.

Illustration 1

SA

VE FOR FUTURE USE

59-1/4" (1505mm)

- 1 -

Summary of Contents for Passage Subway P2969SWT

Page 1: ...truction Adhesive x2 Tubes Tub Tile Sealant BEFORE YOU BEGIN Local building codes vary by location Observe all local plumbing and building codes Unpack your new shower walls and inspect them carefully...

Page 2: ...fully dry 3 Starting with the bottom rear back panel first apply 1 4 6mm bead of adhesive on the substrate in evenly spaced vertical strips every 6 152mm for each panel top to bottom Apply one row of...

Page 3: ...ooth blade cut along line on finished tile side Ensure a new blade is used 3 Once both side panels are properly dry fitted mark all panels and trim as needed a Apply tape to approximate location b Mar...

Page 4: ...ssories American Standard s limited warranty on these items is one year for parts only and excludes labor This one year limited warranty covers accessories manufactured by American Standard e g aprons...

Page 5: ...R Le code du b timent varie selon la r gion Respectez les codes de plomberie et du b timent de votre r gion D ballez vos murs de douche et inspectez les minutieusement pour v rifier s ils sont en bon...

Page 6: ...cer avec le panneau arri re du bas appliquez des cordons d adh sif de 1 4 po 6 mm sur le mat riel de base en tra ant des rayures quidistantes tous les 6 po 152 mm pour chaque panneau de haut en bas Ap...

Page 7: ...la ligne du c t fini des carreaux avec une scie sauteuse et une lame dents fines Utilisez une lame neuve 3 Apr s avoir bien install les deux panneaux lat raux marquez tous les panneaux pet d coupez le...

Page 8: ...et accessoires La garantie limit e d American Standard couvrant ces articles est d un an pour les pi ces seulement et ne couvre pas la main d oeuvre Cette garantie limit e d un an couvre les accessoi...

Page 9: ...ducha y f jese atentamente que no est n da adas Verifique que las paredes sean del tama o correcto para su instalaci n NOTA Tenga mucho cuidado al manipular las superficies frontales de las paredes Us...

Page 10: ...en por completo 3 Comenzando en primer lugar con el panel posterior trasero inferior aplique una gota de adhesivo de 1 4 6mm sobre el sustrato en tiras verticales espaciadas uniformemente cada 6 152 m...

Page 11: ...caladora con hoja de dientes finos corte a lo largo de la l nea en el lado acabado del azulejo Aseg rese de que se use una hoja nueva 3 Una vez que ambos paneles laterales se ajusten correctamente en...

Page 12: ...rant a limitada de American Standard sobre estos art culos es de un a o para las piezas nicamente y excluye la mano de obra Esta garant a limitada de un a o cubre los accesorios fabricados por America...

Reviews: