RECOMMENDED TOOLS AND MATERIALS
Level
Tape Measure
Installation steps will indicate which tools should be used with asscociated letter
Square
Painter’s
Masking Tape
Jig Saw with fine
tooth blade
SOLD SEPARATELY
x4 Tubes Waterproof Instant
Grab Construction Adhesive
x2 Tubes Tub & Tile Sealant
Drill
Suction Cups - optional
Caulking Gun
Hole Saw
Safety
Equipment
Pencil
A
B
C
E
I
J
K
F
G
H
D
1234567891
01
1 1234567891
0 11 12 13 14 15 16 17 18 19 20 21 22 23 24
INSTALLATION INSTRUCTIONS
IMPORTANT GENERAL INFORMATION
This unit is best installed by two people.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using Box
Contents as a reference. If any parts are damaged or missing refer to the description noted in the
instructions when inquiring about replacements. Be sure to wear safety glasses whenever drilling
or cutting.
BOX CONTENTS
1 - 72" x 24" Side Panel
1 - 72" x 24" Rear Panel
1 - 72" x 31.44" Side Panel
1 Corner Panel