
SPRAY INSTALLATION
4
Assemble SPRAY BODY (1) to BIDET. Using putty, seal
underside of SPRAY BODY FLANGE (2) and secure with
NUT (3).
Screw SPRAY CAP (9) onto SPRAY BODY (1).
Screw SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY
BODY (1). Connect other end of HOSE (4) with SEAL
WASHER (6) to side outlet NIPPLE (7) of the TRANSFER
VALVE (8).
PUTTY
COUPLING
NUT
6
2
7
8
1
3
5
4
9
5
Unscrew LIFT ROD NUT (1)
from LIFT ROD GUIDE (2).
Make sure SEAL (3) is seated
into ESCUTCHEON of LIFT ROD
GUIDE (2).
Drop LIFT ROD GUIDE (2) into
rear hole of bidet and from
below secure with ROD GUIDE
NUT (1).
TEE AND HOSE CONNECTION
3
1
3
2
3
Cold
Hot
Front
1
2
4
5
6
6
Insert SEAL (1) into ADAPTER (2)
and tighten ADAPTER (2) to bottom
of TRANSFER VALVE (3).
Install SEAL (4) into coupling nut
of TEE (5) and tighten connection
to ADAPTER (2)
Connect HOSE COUPLING
NUTS (6) to Hot and Cold
valve bodies and securely
tighten.
M 9 6 8 2 9 3
LIFT ROD GUIDE INSTALLATION
VALVE STEM
13
12
11
9
10
Install HANDLE ADAPTER (10) onto valve stem.
Push DIVERTER KNOB (9) onto HANDLE ADAPTER (10).
Install RING (11) onto DIVERTER KNOB (9) and tighten with
SCREW (12).
Press on KNOB CAP (13).
6
1
2
TOP
Figure "A"
SPLINE END DOWN
INSTALL HANDLES
4
3
7
5
6
Push INDEX CAP (6) in hole of HANDLE (4).
Secure HANDLE (4) with HANDLE SCREW (5).
Find correct position of HANDLE (4) by adjusting male teeth on
ADAPTER (1) to female teeth in HANDLE (4).
Thread HANDLE BASE (3) onto DECK ADAPTER (7)
Push HANDLE (4) onto ADAPTER (1).
Push ADAPTER (1) on VALVE STEM (2), so that the hole of the
ADAPTER (1) without spline is facing up. See figure "A".
LEVER HANDLES:
DIVERTER KNOB: