
4
Unscrew LIFT ROD NUT (1)
from LIFT ROD GUIDE (2).
Make sure SEAL (3) is seated
into ESCUTCHEON of LIFT ROD
GUIDE (2).
Drop LIFT ROD GUIDE (2) into
rear hole of bidet and from
below secure with LIFT ROD
NUT (1).
1
3
2
Cold
Hot
Front
M 9 6 8 2 9 2
LIFT ROD GUIDE INSTALLATION
Install HANDLE ADAPTER (8) onto valve stem (12).
Push DIVERTER KNOB (7) onto HANDLE ADAPTER (8).
Install RING (9) onto DIVERTER KNOB 7) and tighten with
SCREW (10).
Press on KNOB CAP (11).
6
1
2
TOP
Figure "A"
SPLINE END DOWN
INSTALL HANDLES
4
3
7
5
6
Push INDEX CAP (6) in hole of HANDLE (4).
Secure HANDLE (4) with HANDLE SCREW (5).
Find correct position of HANDLE (4) by adjusting male teeth on
ADAPTER (1) to female teeth in HANDLE (4).
Thread HANDLE BASE (3) onto DECK ADAPTER (7)
Push HANDLE (4) onto ADAPTER (1).
Push ADAPTER (1) on VALVE STEM (2), so that the hole of the
ADAPTER (1) without spline is facing up. See figure "A".
SPRAY INSTALLATION
3
Assemble SPRAY BODY (1) to BIDET. Apply putty to
underside of SPRAY BODY FLANGE (2) to seal and
secure with NUT (3).
Thread SPRAY CAP (9) onto SPRAY BODY (1).
Thread SPRAY HOSE (4) with SEAL WASHER (5) to
SPRAY BODY (1). Connect other end of HOSE (4) with
SEAL WASHER (6) to bottom outlet NIPPLE (7) of the
TRANSFER VALVE (8).
PUTTY
6
2
7
8
1
3
5
4
9
Insert SEAL (1) into ADAPTER (2) and tighten
ADAPTER (2) to side inlet of TRANSFER VALVE (3).
Install SEAL (4) into coupling nut of TEE (5)
and tighten connection to ADAPTER (2)
Connect HOSE COUPLING NUTS (6)
to Hot and Cold valve bodies
and securely tighten.
TEE AND HOSE CONNECTION
5
3
1
2
4
5
6
6
8
12
11
10
9
7
LEVER HANDLES:
DIVERTER KNOB: