
5
1) Turn shower handle counterclock-
wise approximately 1/4 turn to put
valve in cold position.
Operation (Temperature Control)
2) Turn shower handle counterclock-
wise approximately 1/2 turn to put
valve in warm position.
3) Turn shower handle counterclock-
wise approximately 3/4 turn to put
valve in hot position.
Installation
9) Press tabs on wall ell flange. Install wall ell (K) to pipe
fitting. Turn clockwise to secure.
2
3
K
1
1
10) Attach hand shower (H) to hose (N). Attach hose (N) to
vacuum breaker (M). Connect vacuum breaker (M) to
wall ell (K). Turn clockwise to tighten.
H
2
N
1
2
4
K
M
N
3
3
Operation (Diverter Control)
1) Turn diverter handle left for tub spout operation.
2) Turn diverter handle right for showerhead operation.
P-3A SYMMONS 9604-PLRX