
USER
MANUAL
817NG
U
SE
B.37
7845282-06 03/20
subject to change without notice
B.7.7
OPENING PROCEDURE
1) If the crane is in folded position, fully retract the 2nd boom cylinder (articulation cylinder).
2) Lift the 1st boom so that the 2nd boom can rotate freely.
3) Take the 2nd boom in horizontal position.
1
2
3