Page
33
of
38
Commercial Hot Water
Heat Pump Unit
Quick Start Procedure
✓
Press the Target Temp button and the setting screen will
now be displayed. Press ENTER button and the curser
will now be flashing on Mode: OFF. Press the UP or
DOWN arrows to select Heat ONLY or OFF. Press the
ENETR button when desired mode is flashing
✓
Set Heating Water Target Temperature using UP or
DOWN arrows then press ENTER
✓
Press RETURN button to return to MAIN SCREEN.
Heat pump unit will now start to run on selected mode
✓
Keep an eye on system supply and return water
temperatures. Check system pumping flow rates and
proceed to bleed air from all air bleed points on Hot
Water System
✓
Run system through heating cycle to check operation
✓
Full system operation real time date can be viewed by
pressing the DOWN arrow button from the MAIN
SCREEN
✓
Keep pressing the DOWN arrow to view all heat pump
operation screens
Summary of Contents for ASHP-23
Page 6: ...Page 6 of 38 Diagram Photo Copyright AusGeothermal 2018 ...
Page 7: ...Page 7 of 38 Commercial Hot Water ...
Page 8: ...Page 8 of 38 Hydronic Heating ...
Page 9: ...Page 9 of 38 Hydronic Heating ...
Page 10: ...Page 10 of 38 Hydronic Heating ...