![Amazone KE 3002 Original Operating Manual Download Page 78](http://html1.mh-extra.com/html/amazone/ke-3002/ke-3002_original-operating-manual_2919765078.webp)
6.5.12 Preparing the GreenDrill for operation
6.5.12.1 Filling the hopper
1.
Couple the implement to the tractor.
2.
Switch off control terminal.
3.
Unlock the locking mechanism
2
.
4.
Swivel the steps
1
down.
1
2
CMS-I-00003612
5.
Climb onto the loading board
1
.
6.
To fill the hopper,
open the hopper cover
2
.
7.
When the hopper has been filled to the desired
fill level,
close the hopper cover.
8.
Swivel up the steps.
9.
Secure the steps.
1
2
CMS-I-00003611
6.5.12.2 Adjusting the seed distributor
1.
Loosen the bolts
1
.
2.
To spread the seed directly in front of the roller
3
,
swivel the seed distributor
2
to the desired
position.
3.
Tighten the bolts.
3
2
1
CMS-I-00003628
CMS-T-00005049-A.1
CMS-T-00005047-A.1
CMS-T-00005048-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6878-EN-II | D.1 | 18.05.2021
72
Summary of Contents for KE 3002
Page 1: ...Original operating manual Rotary harrow KE 3002 KE 4002 SmartLearning www amazone de ...
Page 6: ......
Page 119: ......