
UF01 and FT1001 with Flow Control (optional)
6.7
Filling
See operating manual for field sprayer ISOBUS software.
CAUTION
When the UF front tank combination is filled, the
UF
tank nomi-
nal capacity must not be exceeded.
Automatic pumping during operation would overfill the
UF
tank.
The front tank is filled via:
•
The
UF
field sprayer,
•
The filling menu of the in-cab terminal
→
Refer to the
UF
and in-cab terminal operating manuals.
Call up the filling menu for this purpose.
To fill the front tank / field sprayer combination:
•
The
UF
container is filled when the
UF
fill level is < 20%.
•
The front tank is filled when the
UF
fill level is > 20%.
•
The
UF
container is completely filled when the
FT
fill level =
100% and the spray liquid circulation is switched on.
6.8
Internal cleaning
See operating manual for field sprayer ISOBUS software.
6.9
Failure of a level sensor
When a level sensor fails:
•
An alarm signal appears.
•
The mode switches from
Automatic
to
manual
,
•
Both valves of the Flow Control close.
FT
BAG0065.6 02.19
41
Summary of Contents for FT 1001
Page 59: ...Pump maintenance FT BAG0065 6 02 19 59...
Page 60: ......