8
This Machine is Manufactured for
Commercial use only.
This machine is designed and manufactured for
indoor use on hard floor surfaces. Amano Pioneer
Eclipse does not recommend use of this machine in
any environment other than an indoor environment.
This battery powered floor machine is designed and
manufactured for commercial floor cleaning only. This
machine is designed to clean most modern types of
floors including composition tile, stone, marble, terrazzo,
and resilient floor covering, and some coated wood
floors.
Operator Responsibility
The operator is responsible for performing the
recommended daily maintenance and checkups of the
machine to keep it in good working condition. The
operator must inform the service mechanic or supervisor
when recommended maintenance procedures are
required as prescribed in the MAINTENANCE section of
this manual.
Read this manual carefully before operating this
machine.
FOR SAFETY:
Do not operate machine before reading
and understanding the operation manual.
Check the machine for shipping damage.
Keep your machine regularly maintained by following
the maintenance information in this manual. We
recommend taking advantage of a service contract from
your Amano Pioneer Eclipse Authorized Distributor or
Service Center.
Order parts and supplies only from an Authorized
Amano Pioneer Eclipse Distributor. Use the parts
illustration section of your manual when ordering parts.
During and after operation, perform the recommended
daily and hourly procedures outlined in the Maintenance
Chart.
Test for Operator-Ear Sound Pressure Level
Amano Pioneer Eclipse measures and rates the
operator-ear sound pressure level for hand-guided floor
treatment and floor cleaning machines for industrial use.
All tests are performed in accordance with European
Machinery Directive (2006/42/EC).
Outdoor test area consists of a flat open space free
from effects of signboards, buildings or hillsides for at
least 15m (50ft) from the center of the test surface.
Indoor tests are conducted in a semi-anechoic or
sound deadening room.
The test surface is a single sheet of floor covering at
least 1m (3.3ft) wider and longer than the equipment
being tested. In order to not affect the sound
reading, the observer taking readings is at least 2m
(6.6ft) from the equipment being tested, or standing
directly behind the operator.
All machines are tested while stationary and centered
on the test surface. With the traction drive in neutral
(where applicable) the test is conducted with the
machine at maximum engine or motor speed as
specified by the manufacturer.
The operator is located in the normal operating
position with the microphone or meter supported
independent of the machine, 1, 68m (66in) above
the test surface, 25cm (10in) to the right and left
centerline of the operators position, an 20cm (8in) to
the rear most point of the handle, with the handle in
the most forward position.
The sound level meter is observed for a minimum of
five seconds or until a stabilized reading is obtain.
The maximum repeatable sound level observed
during the test at each microphone position is
recorded and documented.
Test for Hand-Arm Vibration at the Grip
Surface of Hand-Guided Machinery
Amano Pioneer Eclipse measures and rates the
vibration at the machine-hand contact surface of
hand-guided machines that are provided with handles
in accordance with European Machinery Directive
(2006/42/EC).
The test area consists of a flat open floor area that
allows the machine to be operated normally
The transducer is mounted firmly at a point halfway
along the length of the handle where the handle
would normally be held.
Machines are tested while stationary, with all
mechanisms necessary for the equipment to perform
its intended functions engaged and the traction drive
in neutral (if applicable). The machine will be tested
at maximum engine or motor speed as specified by
the manufacturer of the subject machine.
The measurements are recorded from the dominant
axis.
Summary of Contents for PE310AS
Page 1: ...Walk Behind Autoscrubber PE310AS Operator s Manual...
Page 2: ......
Page 18: ...Electrical Schematic 18...
Page 20: ...Tanks Cover Assembly 20...
Page 22: ...Pad Drive Assembly 22...
Page 24: ...Drive Wheel Assembly 24...
Page 26: ...Squeegee Assembly 26...
Page 28: ...Handle Assembly 28...
Page 30: ......
Page 31: ......