
5-10
COMPONENTS
TEST PROCEDURE
RESULTS
STIRRER
MOTOR
(Wire leads removed)
Check for continuity of relay 3 an
ohm-meter.
(Remove wire leads from relay 3 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1000)
POWER
LEVEL
1
3 sec
9 sec
2
4 sec
8 sec
3
5 sec
7 sec
4
6 sec
6 sec
5
7 sec
7 sec
6
8 sec
4 sec
7
9 sec
3 sec
8
10 sec
2 sec
9
11 sec
1 sec
10
12 sec
0 sec
Normal: Approx. 3~3.5 kohm
Abnormal: Infinite or several
ohm.
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 3
BLOWER MOTOR
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale: R x 100)
Normal: Approx. 14~21 ohm
Abnormal: Infinite or several
K-ohm.
RELAY 3
Summary of Contents for RCS10A
Page 17: ...SCHEMATIC DIAGRAM 4 11 ...
Page 37: ...6 4 2012 2000 2400 2005 2006 2381 W130 W102 CONTROL PANEL PARTS MODEL RCSPBDA RFS12G EV ...
Page 38: ...6 5 2012 2400 2005 2006 2381 W130 2000 2002 W102 CONTROL PANEL PARTS MODEL RCS10PBDA EV ...
Page 39: ...2004 2000 2381 2002 2006 W130 W102 CONTROL PANEL PARTS MODEL RCS10A RCS10MPA 6 6 EV ...