![Amadas RMH1000M Manual Download Page 33](http://html1.mh-extra.com/html/amadas/rmh1000m/rmh1000m_manual_2915876033.webp)
RMH1000M
Preparation
Install the Lift Mast
5. Install the clamp to hold the hoses in place
on top of the RMH.
6. Continue routing the hoses over the back
of the RMH as shown in the photo below.
7. Install the second clamp as shown in the
photo.
8. Follow instructions for purging hydraulics.
Install clamp here
Install clamp here
Route hoses
MAN137
5/29/2015
23
Summary of Contents for RMH1000M
Page 10: ...Introduction RMH1000M NOTES viii 5 29 2015 MAN137...
Page 23: ...RMH1000M Safety Decals MAN137 05 29 15 13...
Page 34: ...Preparation RMH1000M NOTES 24 5 29 2015 MAN137...
Page 44: ...Operation RMH1000M NOTES 34 5 29 2015 MAN137...
Page 50: ...Maintenance RMH1000M Grease Point Locations Grease points Grease point 40 5 29 2015 MAN137...