![Alvarion BreezeMAX PRO 5000 CPE Product Manual Download Page 36](http://html1.mh-extra.com/html/alvarion/breezemax-pro-5000-cpe/breezemax-pro-5000-cpe_product-manual_2915187036.webp)
Chapter 2 - Installation
Installing the ODU of the CPE
BreezeMAX PRO 5000 CPE
19
Product Manual
2.1.5
Connectors
2.1.6
Connecting the Cables
2.1.6.1
Connecting the Grounding Cable
The Grounding screw (marked
) is located on the back panel of the ODU (see
).
1
Connect one end of a grounding cable to the grounding screw and tighten the
grounding screw firmly.
Figure 2-4: Bottom Panel of the ODU (SA/SE model without sealing covers)
Figure 2-5: Top Panel of the ODU (SE model)
Table 2-2: CPE-ODU-PRO Connectors
Name
Connector
Functionality
IDU COM
10/100Base-T (RJ-45)
Connection to the IDU
SAU
Special mini USB
Connection to SAU
(ANT, only in SE model) x2
N-Type jack, 50 Ohm
Connection to an external antenna
To connect the grounding cable:
IDU COM
SAU Port
1
2
Summary of Contents for BreezeMAX PRO 5000 CPE
Page 1: ...BreezeMAX PRO 5000 CPE Product Manual Software Version 1 5 April 2010 P N 215643...
Page 17: ...Tables BreezeMAX PRO 5000 CPE xvii Product Manual Table 4 3 CPE Parameters Summary 85...
Page 18: ...1 Chapter Product Description...
Page 27: ...2 Chapter Installation...
Page 46: ...3 Chapter Commissioning...
Page 58: ...4 Chapter Operation...
Page 105: ...A Appendix Troubleshooting...
Page 109: ...Glossary...