
18
Assembly and Dismantling Procedures
Assembly Procedure - Mobile Towers - 3T Method
Ensure horizontal braces and guardrails are fitted correctly. Always fit as shown.
Refer to this checklist before using each time.
Checklist
•
Ensure all brace claws operate and lock correctly prior to erection
•
Inspect components prior to erection
•
Inspect tower prior to use
•
Tower upright and level
•
Castors locked and legs correctly adjusted
•
Diagonal braces fitted
•
Stabilisers/outriggers fitted as specified
•
Platforms located and windlocks on
•
Toeboards located
•
Check guardrails are fitted correctly. See illustration below.