58
E
E
E
EN
N
N
N
Electric diagram
11.4. Lubrication and bearings replacement plan
•
Bow’s journal for tilting the drum
– remove the guards, lubricate with grease or oil.
•
Drive shaft bearings of gear transmission no. 6002 ZZ (2RS)
– replace bearings every 4 years. (approx.
4000 workhours).
•
Bearings in drum’s sleeve no. 6207 ZZ (2RS)
– replace every 4 years. (approx. 4000 workhours).
•
Bearings in bow’s sleeve no. 6006 ZZ (2RS)
– replace every 4 years. (approx. 4000 workhours).
•
Gear transmission of concrete mixer’s drum –
not subject to lubrication !
Each time after finishing work, clean the rim and toothed gear from sand and dirt and flush with water.
M – MOTOR
C - CAPACITOR
W -
SWITCH
Summary of Contents for B-130/Z
Page 2: ......
Page 22: ...20 RU RU RU RU 1 21 2 21 3 22 4 22 5 22 6 23 7 24 8 25 9 31 10 36 11 37 12 39 13 39 14 39...
Page 25: ...23 RU RU RU RU 6 6 1 2 3 1 2 3 4 5 6 2 ALTRAD POLAND S A...
Page 26: ...24 RU RU RU RU 1 II o o o o o 2 o o 3 4 o o o o 5 o 2o 6 2 3 7...
Page 31: ...29 RU RU RU RU MK 130 K 1 25 ZA 2 M8 70 M8 3 45 38 0 8 M8 70 M8 4 M10 60 M10 5 8 25 8 5 8 5 8...
Page 38: ...36 RU RU RU RU 10 10 1 10 2 2 230 50 6 II OWY OPL 2 1 5 2 10 2 2 5 2 2 S122 10 3 22 30o 1 5 3...