44
Glazing
9
Now complete the glazing by fitting the
roof panes. Slide these all the way up the
glazing bars, making sure they tuck into
the groove in the ridge. Slot 2 of the glass
stops (diagram 52, 54) on and lower the
pane down onto the eaves bar. This will
now support itself while you fix the
capping in place. As with the sides work
in a loop around the building. The
capping for the roof corners is wider than
normal to cover the join of the cover strip
to the roof corner glazing bar. The
capping should also be fitted flush with
the bottom edge of the glass at the eaves.
Dia. 54
External
Diagram 54
EV
03
13
M
EV
03
13
M
Summary of Contents for VICTORIAN OAKHAM
Page 1: ...12 15...
Page 57: ...57 Finished installation 15...