25
Diagram 54
Internal
Roof Assembly
8
36
m
m
Diagram 55
Diagram 56
X-ray
External
Before fixing the bottom of the roof bars, make
sure they are pulled tight into the side glazing
bar leaving no gap (diagram 54).
When in position drill vertically down in the
location shown in diagram 55. Then fix with an
80mm screw.
Work your way around the building until all
roof bars are fixed.
80mm Scre
w
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...