16
Side Assembly
4
Diagram 28
Internal
1
2
3
4
5
EV0999M
Next install the short section to the left of the door
(EV0961). Slot this into place and fix with a mid rail
bracket (EV0999M), diagram 28. Then drill a pilot hole
through the side of the glazing bar to the left of the
door and secure the mid rail with an 80mm screw
(diagram 29).
Diagram 27
Diagram 29
External
Dia. 29
Dia. 28
80m
m Sc
rew
EV0
961
Dia. 29
Dia. 28
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...