Base Assembly 

 

Diagrams 4 to 7 show an exploded base layout depending on the building size.  Floor boards should 
always run in-line with the ridge and eaves bar. 

Diagram 4 

Diagram 5 

Diagram 6 

Diagram 7 

4ft wide x 8ft long 
Workshop

 

4ft wide x 10ft 
long Workshop

 

4ft wide x 
12ft long 
Workshop

 

ABA0166 

ABA0165 

ABA0166 

ABA0166 

ABA0166 

ABA0165 

ABA0166 

ABA0166 

ABA0166 

ABA0166 

4ft wide x 6ft long 
Workshop

 

Summary of Contents for EVOLUTION FUSION

Page 1: ...1 04 18...

Page 2: ...ffit Installation Roof Sheet Installation Rear Fascia Installation Trims Cloaking Installation Greenhouse Installation Gutter Installation Optional Roof Felt Installation Barge Board Installation Ridg...

Page 3: ...r in other vulnerable locations To minimise the risk of wind damage try to select as sheltered a site as possible e g beside a hedgerow or garden fence Additional Considerations Please bear in mind th...

Page 4: ...Choose a site where the building is relatively easy to get to and convenient to bring water to and possibly a supply of electricity Finally and most importantly choose a site where your Alton buildin...

Page 5: ...egin building the frame When screwing through one piece of timber into another it is always recommended to pre drill the first piece This will prevent the timber from splitting which could weaken the...

Page 6: ...relevant to your building 60mm Screw Once all the base sections have been fixed together again with help lower the assembly down to the floor Adjust the position of the floor to suite and check the l...

Page 7: ...boards should always run in line with the ridge and eaves bar Diagram 4 Diagram 5 Diagram 6 Diagram 7 4ft wide x 8ft long Workshop 4ft wide x 10ft long Workshop 4ft wide x 12ft long Workshop ABA0166 A...

Page 8: ...r Door Door ABA0188 ABA0202 ABA0189 ABA0188 ABA0187 ABA0187 ABA0202 ABA0202 ABA0188 ABA0188 ABA0188 ABA0189 ABA0188 ABA0189 ABA0202 ABA0202 ABA0188 ABA0188 ABA0187 ABA0187 ABA0202 ABA0202 ABA0188 ABA0...

Page 9: ...of the building with the large plain panel You can then offer up the next panel adjacent to it The rear panel meets the inside face of the side panel diagram 15 Drill pilot holes and fix together with...

Page 10: ...When fixing the panels make sure you pull them together tightly you can even clamp them if that s easier before fixing diagram 17 On a straight jointed panel the internal surfaces should always be fl...

Page 11: ...gh the lock to give you the position of the handle on the door Fix the handle with the 3 5 x 25mm countersunk screws supplied diagram 20 Before you offer the door up to the assembly you need to remove...

Page 12: ...12 5 Door Installation Slot the door panel into position and fix with 80mm countersunk screws remember to drill pilot holes first Diagram 21 Diagram 22...

Page 13: ...can then fix the side panels to the floor Drill pilot holes and fix with 40mm countersunk zinc plated screws 02 1816 Large plain panels with the diagonal bracing need 4 fixing per panel diagram 23 Sm...

Page 14: ...sure the internal surfaces are flush before fixing Diagram 25 Diagram 28 Diagram 27 Dia 26 Dia 28 Drill pilot holes and fix down with 60mm countersunk screws 02 5110 shown by the arrows below It is c...

Page 15: ...ush with the softwood frame diagram 30 Diagram 29 Diagram 31 Diagram 32 Dia 30 Diagram 30 Dia 32 ABA0222 A B A 0 2 2 2 ABA0182 ABA0183 Fix the transom window from the inside through the upright of the...

Page 16: ...all the transom window frames are connected you can fix down through the cill section into the top of the side panels Check that the groove under the cill section is inline with the front face of the...

Page 17: ...xt drill pilot holes through the notched sections of the ridge plate diagram 38 Drill these slightly off centre as you need to screw into this area later Again fix with 80mm zinc plated screws Diagram...

Page 18: ...s at the bottom and should line up with the softwood frame below on the outside diagram 41 Drill pilot holes at each end of the eaves plate and between each slot then fix with 80mm countersunk zinc pl...

Page 19: ...e slot into the ridge and eaves plates make sure the rafters are tight up to the ridge and likewise tight into the eaves before fixing To prevent movement or twist drill 2 pilot holes in each end and...

Page 20: ...rs and the gable end sections diagram 46 Drill pilot holes and fix with 60mm countersunk screws Diagram 46 Diagram 45 Part No Part Desicription AB0610 Framing Roof Purlin 6ft Long 1890mm AB0611 Framin...

Page 21: ...ble frame diagram 48 Drill 4 evenly spaced pilot holes and fix in place with 60mm countersunk screws diagram 47 When the gable soffit bars are in place you need to mark the outside edge of the bars to...

Page 22: ...gable soffit bar diagram 53 This will give you a slight overhang at the eaves diagram 52 The outside edge should be flush with the outer edge of the gable soffit if the ply sheets do not sit square on...

Page 23: ...zinc plated screws 02 1814 Keep the fixing close to the edge of the sheet to be sure to pick up the roof rafter below You should also fix to the roof purlin in the middle of each roof sheet diagram 5...

Page 24: ...ountersunk screws position one at each end and then at every joint in the ply diagram 56 The screws should be just below the centerline of the rear fascia to be sure they pick up the eaves plate behin...

Page 25: ...king this should be fitted level with the cedar cladding at the bottom of the panel diagram 59 The outer edge should also be flush with the side cladding Fix in place with 50mm Pan head screws EV0367...

Page 26: ...mitred end should line up nicely with the corner of the softwood frame diagram 62 These are fixed in place from the inside of the building so you will need a helper to hold the trim in place while you...

Page 27: ...ioned 55mm from each end using the outside face of the corner cloaking as the reference point diagram 66 Dia 65 Dia 66 Part No Part Description AB0530 Top Trim Rail 6ft Long_Side 1955mm AB0531 Top Tri...

Page 28: ...orner cloaking sections this time you want to position these below the trim rails Again these should be fitted flush with the cladding on the side panels diagram 68 Fix with 50mm Pan head screws Diagr...

Page 29: ...1 Now the cloaking trims can be fitted to all the vertical joints in the panels diagram 70 You can also fit these to the joint between the corner cloaking and the side panels diagram 71 Fix in place w...

Page 30: ...ding drill 3 pilot holes no more than 10mm below the joint in the panel shown by the arrows below diagram 74 Fix in place with 60mm countersunk screws Dia 73 Dia 75 While inside the building it s a go...

Page 31: ...of the ridge cap this is not needed page 38 diagram 56 5 When you have fitted the ridge cap on page 39 section 11 of the main greenhouse instructions you can then return to this instruction book The...

Page 32: ...f waypoint between the first bracket and the expected position of the gutter joint With two brackets attached take a gutter section and fit the end cap to one end offer this up to get the exact locati...

Page 33: ...nce between the gutter joint and the outlet then trim the gutter section to fit this can then be inserted Diagram 80 Diagram 81 Diagram 82 02 2515B 02 2517B 02 2529B 02 2507B 02 2507B 02 2514B Next re...

Page 34: ...s at this length The first section of roof felt should be fitted with an 80mm overhang along the bottom edge Fix the felt in place with clout nails position these around 200mm apart along the bottom e...

Page 35: ...purlin you made these earlier in the build on the soffit bars diagram 50 page 21 Lay the next run of roof felt on the roof all the way up to the ridge fascia position You can then nail the felt in pl...

Page 36: ...er mark on the upper purlin diagram 87 Lay the next length of roof felt on to the ridge and get it in to position Fix down with clout nails and allow the excess to lay on the roof of the greenhouse di...

Page 37: ...o hold it in place Diagram 89 Diagram 90a Starting at the bottom fold the corner in flat and fix with a clout nail diagram 90b then fold the middle section down and fix through the overlap Now fold th...

Page 38: ...ith the felt folded over the gable ends and nailed down you can install the barge boards These should be fitted flush with the top of the roof and eaves diagram 92 Fix in place with 40mm Pan head scre...

Page 39: ...section 12 to install the roof vent to the greenhouse Go on to complete any remaining steps in the greenhouse instructions On page 43 of the main greenhouse instructions diagram 52 the diagram shows...

Page 40: ...ch sections Drill pilot holes and fix the end mounts in place with 80mm countersunk zinc plated screws Diagram 96 Diagram 97 Hold the first workbench sections in place line it up with the marks you ma...

Page 41: ...marks on the framework to acheive the correct position Use two 60mm countersunk screws between sections Once the sections are in place you can fit the workbench cover strips diagram 99 Drill evenly sp...

Page 42: ...ew 1 1 2inx6g Csk Zp 45 02 1816 Chipboard Screw 5 X 40mm Zy 25 02 5110 5 x 60mm Countersunk Passivated 70 02 1868 Chipboard Screw Csk 5 X 80 Zy 35 02 1675 Clout Nails 1 2in 85 02 1680 Panel Pin 30 X 1...

Page 43: ...e 6ft Long 1802mm 1 AB0576 Framing Eaves Plate 8ft Long 2432mm 1 AB0577 Framing Eaves Plate 10ft Long 3062mm 1 AB0578 Framing Eaves Plate 12ft Long 3692mm 1 AB0589 Framing Gable Soffit_6ft wide PS_4ft...

Page 44: ...Alton Greenhouses TGP Ltd Blythe Park Cresswell Stoke on Trent ST11 9RD Telephone 01782 385 409 www Altongreenhouses co uk sales altongreenhouses co uk...