6
Base Assembly
3
With help stand the
base sections on the shorter
edge in the location you want your
workshop, slide together making sure the
top surface of the floor boards are flush. Fix
with 60mm countersunk screws (diagram 2).
Check page 7 opposite for the recommended
layout of the base relevant to your building.
60mm S
crew
Once all the base sections have been fixed
together, again with help, lower the assembly
down to the floor. Adjust the position of the
floor to suite and check the level. If the base is
not level use packers to correct this (diagram 3).
N.B.
If the base is not level this will make the
whole assembly more complicated as panels
will not line up as intended and it’s likely
windows and doors will not operate correctly.
Diagram 1
Diagram 2
Diagram 3
External
Summary of Contents for EVOLUTION FUSION
Page 1: ...1 04 18...