background image

05

SECTION

GENERAL INSTRUCTIONS  -  OVAL POOLS

INSTALLING 

 

THE LINER

TYPE 2  -  bead/snap bead liner

With a snap bead liner you will not use the plastic coping strips that are packed in 
the parts carton of many pools. You can discard those pieces (if they are included). 
Instead, you should have received a beaded liner track (not included) (referred to 
as a “coping bead receiver”). 

(image 5.5)

The beaded liner track should be installed onto the pool wall all of the way around 
the pool. These pieces should be as close together as possible. Leaving spaces 
between bead tracks can cause liner problems later on.

Once all of the beaded liner track is on the wall, you can snap the liner bead into 
the beaded liner track at four random points around the pool. After that is done, 

and you are satisfied with how the liner is situated within the pool, you can con

-

tinue snapping the remainder of the liner into place around the pool.

Go around the entire pool again making certain that the liner is securely snapped 

into the track. This is important to confirm so that the liner does not pull out while 
under pressure of being filled with water.

Go around the liner pool again making certain that the liner is securely snapped 

into the track. This is important to confirm so that the liner does not pull out while 
under the pressure of being filled with water.

5.5

45

TYPE 3  -  hung/J or V-bead line

With a V-Bead liner you will not se the plastic coping strips that are packed in 
the parts carton of your pool. You can discard those pieces, if they are included, 
as they only apply to pools with overlap liners.

The top of the wall of the liner has what is called a “V-Bead” welded onto it. 

Simply open up the bead with your fingers and hang it directly on top of the 

pool wall. 

(image 5.6)

 When this is done properly, the only portion on the out-

side of the pool wall is approximately 1” of the V-Bead. No printed liner material 
is actually going over the top of the wall to the outside of the wall. 

Make sure the bead is on evenly around the entire pool, and that the liner 
is hanging straight down from the top of the wall. The liner should not have 
creases in it because it is twisting around the pool. If the liner is twisting, it is 
because it is not sitting properly in the pool. Make necessary adjustments be-
fore proceeding.

IMPORTANT NOTE:

Some liners may fit very tightly, it is better to 

install uprights, top plate and rail before going 

onto next step.

IMPORTANT NOTE:

Do not trim off the excess liner. (if the liner 

ever needs to be removed, trimming the liner 

will make re-installation very difficult.) Instead, 

roll up any excess liner and tape it in place 

near the top of the wall.

5.6

05

SECTION

GENERAL INSTRUCTIONS  -  OVAL POOLS

INSTALLING 

 

THE LINER

46

Summary of Contents for Aqua Leader Contempra

Page 1: ......

Page 2: ...lgae Remember unsanitary water is a serious health hazard 9 KEEP OFF TOP LEDGES Do not walk on top ledges They can be slippery and they are not a walk way 10 POOL COVER SAFETY The cover must have a ta...

Page 3: ...G Refer to page 6 Inner upright_ 52 Tall Inner upright_ 54 Tall 38590 38591 18 18 20 20 22 22 26 26 26 26 F H J G K I Top ledge clip Outer upright Boot Outer upright clip Steel wall Top ledge spacer T...

Page 4: ...2 38503 38505 38511 38513 4 10 4 4 10 4 6 6 10 4 6 10 4 8 6 12 4 6 12 4 8 10 12 4 10 12 4 12 12 12 4 12 12 14 Parts listing PARTS LISTING L N M 01 SECTION GENERAL INSTRUCTIONS OVAL POOLS Index Descrip...

Page 5: ...Parts listing _ Buttress assembly Part 15x26 15x30 18x33 18x40 21x43 1440335 1440383 1320147 1320138 1320139 1320166 1320164 1184293 1184275 1184052 1184237 1184238 1184105 1184278 6 6 12 12 12 12 6 3...

Page 6: ...02 SECTION GENERAL INSTRUCTIONS OVAL POOLS GROUND PREPARATION Hardware for gibraltar pools...

Page 7: ...your situation Before you start your installation make sure you have all the parts for complete assembling see your parts lists If irregularities such as missing part s or defect s ever occur go to yo...

Page 8: ...near these services or plan to have them installed later by a licensed contractor When locating the centre of the pool be sure to take into consideration any structures deck patio house or relevant i...

Page 9: ...our pool Add 12 30 cm outside this measurement to determine pool perimeter Image 2 7 B PREPARE THE FOUNDATION OF YOUR POOL See Diagrams Please see in the next page for an EXAMPLE p 11 on how to correc...

Page 10: ...tool or a soil compactor c Take material such as rock dust or fine mortar that can con form a solid permanent base and deposit this material around the rim of the basin Image 2 12 d The material used...

Page 11: ...nches Even number of buttresses a If your oval pool contains an even number of buttresses please proceed with next step b If your oval pool contains an odd number position the buttress temporarily on...

Page 12: ...valent 1 25mm thick into the bottom of each trench and around the patio stones Pack firmly Image 2 22 b In each trench measure 32 81 cm from the Pool Wall Line to the end of the channel Carefully add...

Page 13: ...AL POOLS GROUND PREPARATION KEY PART NAME Base U Channel Upright Channel Inside L Bracket Middle T Bracket Outside T Bracket Hold Down Plate Pressure plate Strap Strap Bracket Hardware bag 1per set of...

Page 14: ...The open side of the upright channel will face toward the inside of the pool Line up the holes and fasten with twenty bolts key 5 and nuts key 6 Do not tighten the bolts yet Image 2 28 d First tighte...

Page 15: ...f the base U channels If the limestone is dry spray it with some water to help with the compaction Stand on the base U channel and tamp down the limestone until a solid base is achieved by standing on...

Page 16: ...our nut clips key 24 onto one end of the base chan nel assembly Image 2 36 so they line up over the holes in the base channel The threaded parts of the nutclips should point down Brick sand or vermicu...

Page 17: ...7 11 11 02 SECTION GENERAL INSTRUCTIONS OVAL POOLS GROUND PREPARATION j Begin shifting the hold down plate in a forwards and backwards motion see Image 2 41 while simultaneously applying a downward fo...

Page 18: ...the hold down plate IMPORTANT NOTE setthesecondholddownplateso theflangesoverlap set the second hold down plate so the flanges overlap 11 10 11 7 12 11 2 43 2 44 2 45 2 46 8 9 8 10 02 SECTION GENERAL...

Page 19: ...nd of Section 1 in order to recognize where each bottom rail should be placed IMPORTANT NOTE 3 1 03 SECTION GENERAL INSTRUCTIONS OVAL POOLS ASSEMBLING THE POOL BASE d Slide the other end of the transi...

Page 20: ...soil or sand There must be no space between the ground and the bottom of the rails All patio blocks must be flush with the ground solid and level with each other in all directions NOTE Installing pati...

Page 21: ...t Print Now that you have installed the wall you can be faced with three scenarios The wall joints align perfectly if so move on to the next step 6 Your wall appears to be too short IT IS NOT However...

Page 22: ...or mason s sand all around the inside of the pool wall Build a cove of 3 7 5cm high and not less of well packed screened earth or mason s sand image 4 9 Water the sand to compact it and use a trowel...

Page 23: ...egins going over the wall straight As you put the liner over the wall you can secure it by using the plastic coping strips to keep it in place If you end up with excess material continue around the po...

Page 24: ...e liner does not pull out while under the pressure of being filled with water 5 5 TYPE 3 hung J or V bead line With a V Bead liner you will not se the plastic coping strips that are packed in the part...

Page 25: ...straight up and down IMPORTANT NOTE Ensure to leave a gap between the two bottom rails 6 1 06 SECTION GENERAL INSTRUCTIONS OVAL POOLS ASSEMBLING THE POOL FRAME The wall joints is hidden behind the upr...

Page 26: ...OTE If you have a 15 or a 18 feet pool YOU HAVE TO PLACE THIS SPACER between the upright and the upright bracket For other pool sizes YOU MUST NOT INSTALL THIS PLASTIC SHIM TOP BOTTOM Lay the uprights...

Page 27: ...hed toward the inside part of the pool and the screw holes on the top ledge must align with the holes on the top of the upright image 6 7 Insert partially the four Phillips screws at each end of the t...

Page 28: ...pushed toward the inside part of the pool image 6 9 Partially insert 2 Phillips screw and evenly distribute the space between the two extrimities Then tight up the screws 6 9 6 10 6 11 2x 1x TOP 13 I...

Page 29: ...nd rescue unit available physician ambu lance service and hospital WHEN YOU BECOME OWNER OF A POOL HERE ARE SOME REASONABLE RULES YOU SHOULD BE FAMILIAR WITH You should not dive or jump from the top r...

Page 30: ...bottom plate is 2 1 4 Measure rail like this DO NOT measure rail like this 45 30 45 30 45 30 45 30 45 30 45 30 45 30 45 30 45 30 15x30 OVAL 361 30 FT 1 IN 182 15 FT 2 IN Strap 45 5 16 12 Places 221 22...

Page 31: ...75 57 2375 57 2375 57 2375 57 2375 57 2375 57 2375 57 2375 57 2375 57 2375 18x40 OVAL 480 40 FT Notes 1 Wall length is 1220 2 The bottom rail is approx 1 X 1 and it goes on the ground The pool wall si...

Page 32: ...Places 254 21 FT 2 IN R126 3 52 56 159 228 357 357 CURVE SIDE Bottom Rail Plum 54 5 16 X 10 6 R X 10 Places Inner Stabilizer Black 54 7 16 X 10 6 R X 10 Places TRANSITION CORNER Bottom Rail Plum 53 1...

Page 33: ......

Reviews: