background image

 

 
 
 
 

Use precautions: 
 

The machine must be used by one person at a time. 

During loading, the machine must be stopped in the loading position. 

The machine must be made solid with the dock or building throughout the loading time. 

The hydraulic unit must be stopped, if loading is carried out by means other than the loader arm 
(see descriptive diagram). 

Follow the implementation conditions for the rails and electrical connections, all these operations 
must be carried out by a professional. 

Adjust rotation speed with valves located nearby hydraulic motor and tight screw without head. 
 

 
 
 

Maintenance: 
 

Grease the joints regularly 

On each use check the good condition of the screws and pins. In particular check the support 
fixing screws of the belt and guards. 

Regularly check the oil level of the hydraulic system. Fill up with oil HV46 as required. The first oil 
change is carried out after 

500 hours

 with exchange of the immersed 10-micron return filter. 

After that, change the oil every 

1000 hours

 of use. 

 

Tank capacity: 50 l 

 
 

 

 

ANY DEFECTIVE PART MUST BE REPLACED. THE SCREWS, CLIPS AND PINS 

MUST NOT BE REPLACED WITH OTHER THINGS. 

 

Electrical connection 
Three-phase + earth 
3 x 400V 20A

 

Electrical connection 
of limit switch contacts 
according to diagram 

 

Summary of Contents for DR 160S AXIALE

Page 1: ...THESE INSTRUCTIONS MUST BE READ BEFORE USE...

Page 2: ...AIN WILL NOT ENGAGE OUR RESPONSIBILITY FOR THE RESULTING CONSEQUENCES FOR ALL INTERVENTION WORK CONTACT YOUR USUAL DEALER WHO CAN HELP YOU OR OUR TECHNICAL SERVICE WHICH IS READY TO SOLVE ANY QUESTION...

Page 3: ...rovement the designers of ALTEC equipment are always ready to listen to remarks that can help its improvement We wish you well in the use of your new equipment DR160S AXIAL suspended Radio controlled...

Page 4: ...LOAD ALL THE MOVING PARTS ON THE EQUIPMENT ARE DANGEROUS AVOID PUTTING YOUR FINGERS OR ANY OBJECT INTO A RISK AREA CUT OFF THE MOTOR OF THE MACHINE BEFORE ANY INTERVENTION WORK ON THE EQUIPMENT A DEF...

Page 5: ......

Page 6: ...control The steel cable must be attached to the machine with the shackle provided The commands of the radio control have identical abbreviations and markings only the start up mode is different see th...

Page 7: ...ontrol box Limit switch contact to be put on the machine mechanical stops to be fixed on the rail IPRA port Radio control or wired control Main switch Operating indicator Hydraulic unit Radio antenna...

Page 8: ...Cable fixing point of wired control Control of maximum rotation speed one for right one for left...

Page 9: ...ated nearby hydraulic motor and tight screw without head Maintenance Grease the joints regularly On each use check the good condition of the screws and pins In particular check the support fixing scre...

Page 10: ...w Spreader ____________________________________________________________________ Type DR160S AXIALE SUSPENDUE _______________________________________________________________ European Norm used NF EN 29...

Reviews: