
9
Step 3B Solid Concrete or Concrete Block Option
3B-1
3B-2
WARNING:
Ensure the wall plate is securely fastened to the wall before
continuing to the next step.
● Mount the wall plate directly onto the concrete surface
● Anything covering the wall must not exceed 5/8 in. (16 mm)
● Minimum solid concrete thickness: 203 mm (8 in.)
● Minimum concrete block size: 203 x 203 x 406 mm (8 x 8 x 16 in.)
● Never drill into the mortar between blocks
Avoid potential personal injury or property damage! DO NOT over-tighten the
lag screws [A1]. Tighten the lag screws [A1] only until the washers [A2] are
pulled firmly against the wall plate [01] or [01 and 02].
Position the wall plate [01] or [01
and 02] at your desired height,
level the wall plate and mark the
pilot hole locations.
Drill 4 pilot holes using a 3/8 in.
(10mm) diameter drill bit. Make
sure the depth is not less than
2
9/16 in.(65mm)
. Never drill into the
mortar between blocks.
Wall
Anchor
A3
ø3/8 in. (10mm)
2 9/16 in. (65mm)
01
02