8
Section 2
Installation
This section tells you how to install
the Pinnacle Plus series.
• A pre-installation checklist (Section 2.1).
• How to connect the unit to the line and the
loads (Section 2.2).
• How to connect an external battery pack
(Section 2.3).
• How to connect an emergency power off
switch (Section 2.4).
• How to connect the RS–232 port (Section 2.5).
• How to connect the unit to a network
(Section 2.6).