background image

Installation of the system

1. OKU-Absorbers are supplied with connecting pieces that are opened 
diagonally. If further connections ar required to connect the absorbers in
series only the cap has to be cut off.

2. Place the OKU-Absorbers on the designated areas in the arrangement that is
desired and connect them with hose connections and hose saddles according with the 
the scheme of connection. In case of steeper sloping roofs roof fastenings must be 
carried out simultaneous ly to prevent absorbers from slipping away dur ing 
installation.

It is recommended that you us e a TEK screw type fixing for fitting 

the panel to the r oof , a flat washer is needed under neath the TEK head and a 
silicone washer is required between the bottom of  the panel and the top of  the roof to make water proofed.
3. To make circuit points for supply and return lines connect the 25mm PVC joiner  into the hose fitting
and add it with the hos e coupling on the abs orber. If you take a pipe dia. 25 mm or  bigger you have to
glue a 25 x 40/50/65 PVC Inc reasing bush or valve socket to convert to another type of pipe.

4. Vent valve (8): The vent valve must be installed vertically. Glue in connection correspondingly 
and screw in vent valve.

5. Install 3-way valve (5) behind filter pump (3). 

to the absorbers

back to the swimming pool

out of the swimming pool

The iso valve installed after the solar pump is to be used as a flow restrictor as well , turn the valve 1/4 turn off

6. Put tee for collector forerun into pipe leading to the pool. Glue Stop c ock (9) - downdraft brake  
 into forerun pipe

7

5

3

Summary of Contents for OKU

Page 1: ...h the absorbers by the auxiliary pump This pump is switched by the difference temperature regulation to ensure that it only runs to actually win energy The filter and solar pump are separately regulat...

Page 2: ...with filter pump via three way motor ball valve with difference temperature regulation 1 OKU absorber 5 Three way motor ball valve 9 Stop cock downdraft brake 2 Difference temperature regul ator OE 1...

Page 3: ...d a silicone washer is required between the bottom of the panel and the top of the roof to make water proofed 3 To make circuit points for supply and return lines connect the 25mm PVC joiner into the...

Page 4: ...st the difference temperature to approx 3 or 4 C and place the hand switch on automatic In systems working with filter pumps adjust the filter cycle to the hours of sunshine Installations with own pum...

Page 5: ...2 Screw in pipe clamp 1 2 zinc plated with a gum inlay Ar t N 3213 3 Perforated tape zinc plated 12 x 1 Art N 3210 with a screw 5 x 16 Art N 3211 1000 1001 1001 1000 3 2 4 1 2 3 4 1 1000 1001 1001 10...

Page 6: ...fe the OKU Absorbers against the wind Therefore you can stretch a wire rope or a perlon hurry against the absorber field at intervals of circa 2 m and anchor it on the edge of the roof You also can we...

Page 7: ...But you have to screw in the ring screw through the roofing into the foundation If you have a wooden foundation screw it into the boarding or battens If you bore slate or cement asbestos you have to...

Reviews: