background image

7. Construct and fix forerun and return travel of collector (4). If for winter a drain cook is needed 
glue a reducing tee with reducing piece 1/2" for the drain cook.

8. Regulation: Pleas e take a look at the instruction for installation and oper ating for the
difference-temperature regulation and the thr ee-way motor ball valve respectively the pump.
Attention should be paid to the ac complishment of electrical installation. Swimming pools
systems have to be equipped with a ear th leakage circuit breaker.

Fasten collector sensor (6) to absorber with clamp. Glue reducing tee with nipple 1/2" f or swimming
pool sensor (7) into pipe coming from the pool and s crew in sensor. Fix the difference-temperature 
regulator and fasten it like the wiring diagram.
Use wires with cross-section 2 x 1 mm² to lengthen sensor adaptors.

If you take a pump with mor e than 600 W  charging rate or three-phase pumps, you have to install a

If you take a pump with mor e than 600 W  charging rate or three-phase pumps, you have to install a
contactor.

Operating Instruction

To start the system adjust the difference temperature to approx. 3 or 4 °C and plac e the hand switch on
automatic. In systems working with filter pumps adjust the filter cycle to the hours of sunshine.
Installations with own pump wor ks independent f rom the filter circuit. 

If after a few minutes the system works still with air in it, close the stop cock (downdraft brake) a little until  
the water escape at the intak e nozzle is majority free of air. The stop cock now always stay this way.
Additionally you can close the cover cap of the vent valve. 

Operating the system in winter

OKU-Absorbers are frost resistant. Due to the pipes  the system must be emptied in winter  nevertheless.
Usually systems which emptied when they´ re switched off, don´t need any precaution.

Advice to glue pvc pipes

Glue pvc pipes only if they´re absolutely dry. Water, condensates and humidity pr event a good connection. 

Don´t glue under a Temperature of 5°C. The time f or drying is circa 24 hours, do not use it 
with pressure before.

Clean ends and fittings with a cleaner. Glue both par ts the same way. Take a flat brush.
It´s important to disperse the glue lengthwis e from the inside to the outside. 
Directly after apply the glue you hav e to plug ends  and fittings together. 
Take of the surplus glue. Clean the br ush with cleaner.

Summary of Contents for OKU

Page 1: ...h the absorbers by the auxiliary pump This pump is switched by the difference temperature regulation to ensure that it only runs to actually win energy The filter and solar pump are separately regulat...

Page 2: ...with filter pump via three way motor ball valve with difference temperature regulation 1 OKU absorber 5 Three way motor ball valve 9 Stop cock downdraft brake 2 Difference temperature regul ator OE 1...

Page 3: ...d a silicone washer is required between the bottom of the panel and the top of the roof to make water proofed 3 To make circuit points for supply and return lines connect the 25mm PVC joiner into the...

Page 4: ...st the difference temperature to approx 3 or 4 C and place the hand switch on automatic In systems working with filter pumps adjust the filter cycle to the hours of sunshine Installations with own pum...

Page 5: ...2 Screw in pipe clamp 1 2 zinc plated with a gum inlay Ar t N 3213 3 Perforated tape zinc plated 12 x 1 Art N 3210 with a screw 5 x 16 Art N 3211 1000 1001 1001 1000 3 2 4 1 2 3 4 1 1000 1001 1001 10...

Page 6: ...fe the OKU Absorbers against the wind Therefore you can stretch a wire rope or a perlon hurry against the absorber field at intervals of circa 2 m and anchor it on the edge of the roof You also can we...

Page 7: ...But you have to screw in the ring screw through the roofing into the foundation If you have a wooden foundation screw it into the boarding or battens If you bore slate or cement asbestos you have to...