6
7
INSTALLATION PROCEDURE
A set of mounting brackets are provided to achieve flexible mounting positions
for concrete wall, ceiling or floor mounting, depending on site requirements.
a. For concrete wall mounting, secure Mounting Bracket (2 pcs) to heater
tank. Position the heater (with Mounting Bracket) by hooking it to the L-shape
Expansion Bolts (2 pcs) on the wall.
b. For concrete floor mounting, secure Mounting Bracket (2 pcs) to heater
tank. Position the heater (with Mounting Bracket) and tighten the Expansion
Bolts (4 pcs).
c. For concrete ceiling, secure U-shape Mounting Bracket (2 pcs) to heater
tank. Position the heater (with U-shape Mounting Bracket) and tighten the
Expansion Bolts (4 pcs).
Positioning of Heater
This model
MUST
be mounted in a
horizontal position
. Refer to the Mounting
Guide Diagram on the next page.
Locate a suitable position for easy installation and future maintenance. Before
determining the bolt’s hole position, ensure that the heater is more than
200mm
from the ground or ceiling board.
After selecting the proper fixing position, drill holes and insert the expansion
bolts firmly into the holes.
Concrete Ceiling
Mounting Guide Diagram
Wall Mounting Right Side
Concrete W
all
Mounting Bracket
Mounting Bracket
Concrete W
all
Mounting Bracket
Mounting Bracket
Maintenance Cover
(rotate 180
o
before mounting)
Wall Mounting Left Side
L-shape Expansion Bolt
IMPORTANT
The installation of electrical and plumbing work must be carried out by
qualified personnel, according to the installation instructions and in
compliance to the local authority regulations.
All plumbing work must be completed and heater tank must be fully filled
with water before proceeding to electrical connections. This will prevent any
damage to the heating element.
This appliance must be installed
indoors only.
Do not
use ABS or PVC plastic pipes for the inlet and outlet connections.
Use only recommended stainless steel, copper or polymer pipes which can
withstand high temperature and pressure.
The unit has to be installed as near as possible to the service points, in
order to reduce heat loss along the pipes. To facilitate maintenance, allow
a distance of
500mm
for easy access to the electrical parts.
The Storage Water Heater should be mounted on a solid cement wall,
preferably close to the power source and water source. The concrete ceiling
or wall must withstand
3 times the weight
of the water heater fully filled
with water.
Screw
Screw
Screw
Screw
L-shape Expansion
Bolt