010-619-J0 Rev B
Page 31
Slide the connection point assembly back into the distribution module and secure with the thumbscrew
lock. Note the cable(s) and the connection points positioned for proper access.
Figure 22:
Breaker Return Connections (Four Load Breaker Configuration shown)
Breaker Hot Connections
Connect to the four load breaker hot (–) termination pairs using 1/4" on 5/8" center lugs. Connection
method is similar for breaker distributions in a 2 load/2 battery CB configuration. Refer to the connection
drawing.
Figure 23:
Front View of Distribution Module (Four Load Breaker Configuration shown)
GMT Fuse Distribution
The ten (10) GMT-style fuses and the associated terminal blocks are accessible from the front panel of
the distribution module (Refer to the connection drawing).
Summary of Contents for Cordex HP 48 1.2kW
Page 2: ......
Page 4: ......
Page 10: ...vi...
Page 14: ...010 619 J0 Rev B Page 4...
Page 16: ...010 619 J0 Rev B Page 6 Figure 1 Single Shelf Figure 2 Dual Shelf Figure 3 2RU Shelf...
Page 28: ...010 619 J0 Rev B Page 18...
Page 30: ...010 619 J0 Rev B Page 20...
Page 46: ...010 619 J0 Rev B Page 36...
Page 56: ...010 619 J0 Rev B Page 46...
Page 58: ...010 619 J0 Rev B Page 48...