background image

                                                                                                                 

TST200 User

s Manual

 

                                                                                                                            10 / 11 

4

4

.

.

4

4

 

 

I

I

n

n

s

s

t

t

a

a

l

l

l

l

a

a

t

t

i

i

o

o

n

n

 

 

 

 

4

4

.

.

4

4

.

.

1

1

 

 

P

P

l

l

a

a

c

c

e

e

 

 

t

t

h

h

e

e

 

 

c

c

a

a

b

b

i

i

n

n

e

e

t

t

 

 

The equipment has two parts one is a 19

2U cabinet and a STS module.   

Put the shelf on the right location of 19inch rack (Caution: Additional support must be added as 

bottom

). Try to push the unit from the front and side to see it moves; and repeat the above 

action until it is firmly secured..   

 

 

4

4

.

.

4

4

.

.

2

2

 

 

 

 

C

C

o

o

n

n

n

n

e

e

c

c

t

t

i

i

n

n

g

g

 

 

t

t

h

h

e

e

 

 

c

c

a

a

b

b

l

l

e

e

 

 

    For the user operation safety, cut off the power before installation 

 

Ø

  Connect AC input and AC output 

Ø

  Connect dry contact wire and communication wire 

 

     

Please double check the AC input and AC output was right after connection.   

Wrong connection will cause permanent damage of equipment and it is out of   

warranty. 

 

 

4

4

.

.

4

4

.

.

3

3

 

 

 

 

I

I

n

n

s

s

e

e

r

r

t

t

 

 

i

i

n

n

 

 

S

S

T

T

S

S

 

 

m

m

o

o

d

d

u

u

l

l

e

e

 

 

 

Please insert in the STS module into the cabinet and screw the module. 

 

 

 

 

Summary of Contents for TST200 series

Page 1: ...TST200 User s Manual 1 11 TST200 series Static Transfer Switch USER MANUAL Version 1 0 Date Nov 2009...

Page 2: ...sting and burn in through out the production process Power is certified by TUV in accordance with ISO9001 and can be your reliable power solution provider D Di is sc cl la ai im me er r Unless special...

Page 3: ...de well for later reference The TST200 needs to be installed by professionals and please pay attention to the following points prior to installation 1 Please check the input voltage or voltage of batt...

Page 4: ...o commencing the installation Please follow the local stipulation meantime Any operation against safety requirement or against design manufacture safety standard and are out of the manufacturer warran...

Page 5: ...of STS maintenance l Hot pluggable l Transfer time less than 4ms when input power are synchronization and transfer time is less than 10ms in case of input non synchronization l Integrated Maintenance...

Page 6: ...ion Temp 5C 40C Storage Temp 25C 60C Humidity 93 non condensing Communication RS485 Dry contacts 2 2 3 3 S Sy ys st te em m P Pr ri in nc ci ip pl le e MAIN CNTROL CUR LED DRY CONTACT RS485 CUR K1 3 I...

Page 7: ...e in synchronization Green input 1 normal 2 Input 1 Red input 1 fault 3 Output 1 Green output using input 1 Green Output normal 4 Output Red Output fault 5 Switch switching between input 1 and input 2...

Page 8: ...on fault 1 Dry contact Left 4 Input 2 fault 2 Circuit breaker Input 1 circuit breaker 3 Connector Input 1 L 4 Connector Input 1 N 5 Connector Earth 6 Connector Input 2 L 7 Connector Input 2 N 8 Circui...

Page 9: ...dule and subrack is same to that on outer carton 4 4 2 2 L Lo oc ca at ti io on n Please install the equipment in a location of Dry Clean Cool with good ventilation l Working temperature 0 40 l Storag...

Page 10: ...nd repeat the above action until it is firmly secured 4 4 4 4 2 2 C Co on nn ne ec ct ti in ng g t th he e c ca ab bl le e For the user operation safety cut off the power before installation Connect A...

Page 11: ...e input 1 switch the STS will resume to input 1 At auto position you can not manually choose input 1 or input 2 5 5 4 4 M Ma ai in nt te en na an nc ce e B By yp pa as ss s T Te es st t Plug out the S...

Reviews: