2
Subject to change without notice | 83056800fUK – Translation of the original operating manual | ait-deutschland GmbH
Table of contents
1 About this operating manual
...................... 3
1.1 Validity ....................................................... 3
1.2 Reference documents ............................... 3
1.3 Symbols and identification markings
........ 3
1.4 Contact ...................................................... 4
2 Safety
............................................................... 4
2.1 Intended use ............................................. 4
2.2 Personnel qualifications
............................ 4
2.3 Personal protective equipment ................. 4
2.4 Residual risks
............................................ 4
2.5 Disposal .................................................... 5
2.6 Avoid damage to property ......................... 5
3 Description
...................................................... 6
3.1 Layout ....................................................... 6
3.2 Accessories............................................... 7
3.3 Function .................................................... 8
4 Operation and care
....................................... 8
4.1 Energy and environmentally aware
operation ................................................... 8
4.2 Maintenance.............................................. 8
5 Delivery, storage, transport and
installation
....................................................... 9
5.1 Scope of supply ........................................ 9
5.2 Storage ...................................................... 9
5.3 Unpacking and transport
........................... 9
5.4 Installation ................................................11
6 Installation and connection
........................11
6.1 Dismantle the module box .......................11
6.2 Install the module box ............................. 14
6.3 Install the hydraulic connections ............. 14
6.4 Connect the electrical cables .................. 15
6.5 Installing the control panel ...................... 16
7 Flushing, filling and venting
...................... 17
7.1 Remove the front panel
of the module box .................................... 17
7.2 Fill, flush and vent heat source
............... 17
7.3 Vent the circulation pump of the heat
source ..................................................... 18
7.4 Flush and fill the heating and
domestic hot water charging circuit ......... 18
8 Insulate hydraulic connections
................ 19
9 Commissioning
............................................ 19
10 Maintenance
................................................. 20
10.1 Basic principles ....................................... 20
10.2 Maintenance as required ........................ 20
10.3 Clean and flush the evaporator and
condenser ............................................... 20
10.4 Yearly maintenance ................................. 20
11 Faults
.............................................................. 20
11.1 Manually unblock the heat source
circulation pump ...................................... 20
12 Dismantling and disposal
.......................... 21
12.1 Dismantling ............................................. 21
12.2 Disposal and Recycling ........................... 21
12.3 Removal of the buffer battery
.................. 21
Technical data / Scope of supply
............ 22
SW 42(H)(K)3 – SW 62H3 ............................... 22
SW 82H3 – SW 102H3 ..................................... 23
SW 122H3 – SW 142H3 ................................... 24
SW 172H3 – SW 192H3 ................................... 25
Performance curves
................................... 26
SW 42(H)(K)3 ................................................... 26
SW 62H3 .......................................................... 27
SW 82H3 .......................................................... 28
SW 102H3 ........................................................ 29
SW 122H3 ........................................................ 30
SW 142H3 ........................................................ 31
SW 172H3 ........................................................ 32
SW 192H3 ........................................................ 33
Dimensional drawings
................................ 34
SW 42(H)(K)3 – SW 192H3 .............................. 34
Control unit ....................................................... 35
Wall-mounted bracket
...................................... 35
Installation plans
.......................................... 36
Installation plan 1 ............................................. 36
Installation plan 2 ............................................. 37
Installation plan 3 ............................................. 38
Hydraulic integration
................................... 39
Hydraulic integration (heating) ......................... 39
Hydraulic integration (cooling) .......................... 40
Keys hydraulic integration ................................ 41
Terminal diagrams
...................................... 42
SW 42K3 .......................................................... 42
SW 42H3 – SW 192H3 ..................................... 43
Circuit diagrams
........................................... 44
SW 42K3 .......................................................... 44
SW 42H3 – SW 82H3 ....................................... 47
SW 102H3 – SW 122H3 ................................... 50
SW 142H3 – SW 192H3 ................................... 53
EC Declaration of Conformity
.................. 58