11 Commissioning
9
Relevant planning & design data of the system is
documented in full.
9
7KHFRPSHWHQWHQHUJ\VXSSOLHUKDVEHHQQRWL¿HG
of the operation of the heat pump system.
9
System is air-free.
9
Installation check using the rough checklist has
been completed successfully.
1.
(QVXUH WKDW WKH IROORZLQJ SRLQWV DUH IXO¿OOHG
completely:
Ɣ &ORFNZLVHURWDWLQJORDGLQIHHG¿HOGLVDYDLODEOH
at the compressor.
Ɣ
The system is installed and mounted in
accordance with this operating manual.
Ɣ
The electrical installation has been carried out
properly in accordance with this operating
manual and local regulations.
Ɣ
The power supply for the heat pump is
equipped with an all-pole circuit breaker with
at least 3 mm contact spacing (IEC 60947-2).
Ɣ
The level of the tripping current is compliant.
Ɣ +HDWLQJFLUFXLWLVÀXVKHGDQGYHQWHG
Ɣ $OO VKXWRႇ GHYLFHV RI WKH KHDWLQJ FLUFXLW DUH
open.
Ɣ
The pipe systems and components of the
system are leak-tight.
2. Fill out carefully and sign the notice of completion
for heat pump systems.
3. In Germany and Austria: Send notice of
completion
for
heat
pump
systems
and
rough
checklist
to
the
manufacturer’s
factory
customer
service
department.
In other countries: Send notice of completion for
heat pump systems and rough checklist to the
manufacturer’s local partner.
4. Arrange for the heat pump system to be
commissioned by after sales service personnel
authorised by the manufacturer; this is a
chargeable service.
12 Maintenance
NOTE
We recommend that you conclude a
maintenance agreement with an accredited
heating company.
12.1 Basic principles
The refrigerant circuit of the heat pump requires no
regular maintenance.
Local regulations– e.g. EU Regulation (EC) 517/2014 –
include a requirement for leakage controls beforehand
and/or for a log book to be kept for certain heat pumps.
Ź
Ensure compliance with local regulations with
UHJDUGWRWKHVSHFL¿FKHDWSXPSV\VWHP
12.2 Maintenance as required
Yearly, more frequently if necessary:
Ɣ
Checking and cleaning the components of the
heating circuit, e.g. valves, expansion vessels,
UHFLUFXODWLQJSXPSV¿OWHUVGLUWWUDSV
Ɣ
Test the function of the safety valve for the heating
circuit.
Ɣ
Check regularly to ensure that the condensate
can drain out of the unit freely, without obstruction.
To this end, check the condensate pan in the unit
and the evaporator regularly for dirt / blockages
and clean as necessary.
Ɣ
Check at regular intervals whether the evaporator
and the leaf guard need to be cleaned.
1
1
2
1 Evaporator (left, right)
2 Leaf guard
1. Unscrew both top sidewalls for best possible access.
2. If necessary remove leaves and contaminants.
3. Reattach sidewalls.