Hydraulics key

140304

1

Heat pump

51

Separate storage tan

k

TA/A

Outdoor senso

r

2

Underfloor heating / radiator

s

52

Gas or oil-fired boile

r

TBW/B

Domestic hot water senso

r

3

Vibration isolato

r

53

Wood-fired boile

r

TB1/C

Flow sensor, mixing circuit 1

4

Unit underlay, Sylomer strip

s

54

Domestic hot water tan

k

D

Floor temperature limite

r

5

Shut-off valve with drain outle

t

55

Brine pressure monito

r

TRL/G

Sensor, external return (separate storage tank

)

6

Expansion vessel included in scope of suppl

y

56

Swimming pool heat exchange

r

STA

Branch control valve

7

Safety valv

e

57

Ground source heat exchange

r

TRL/H

Return sensor (Dual hydraulic module

)

8

Shut-off valve

58

Ventilation in the hous

e

9

Heating circulation pump (HUP

)

59

Plate heat exchange

r

10

Check valve

61

Cooling storage tank (???

)

79

Motor valve

11

Individual room control

65

Compact distributo

r

80

Mixing valv

e

12

Overflow valv

e

66

Fan coils

81

Heat pump outdoor unit, split, scope of suppl

y

13

Vapour-tight insulation

67

Solar domestic hot water tan

k

82

Hydraulic indoor unit, split, scope of suppl

y

14

Domestic hot water circulation pump (BUP

)

68

Separate solar storage tan

k

83

Circulation pump

15

Mixing circuit, three-way mixer (MK1 discharging

)

69

Multifunctional storage tan

k

84

Changeover valv

e

16

Expansion vessel on sit

e

71

Dual hydraulic modul

e

113

Connection, additional heat generato

r

18

Heating element, heating (ZWE

)

72

Wall-mounted buffer tan

k

BT1

Outdoor senso

r

19

Mixing circuit, four-way mixer (MK1 charging

)

73

Pipe penetration

BT2

Flow senso

r

20

Heating element, domestic hot water (ZWE

)

74

Ventowe

r

BT3

Return senso

r

21

Mixing circuit, circulation pump (FP1

)

75

Scope of supply, Dual hydraulic towe

r

BT6

Domestic hot water senso

r

23

Feeder, circulation pump (ZUP) (change over Compact unit connec

ti

o

76

Drinking water station

BT12

Flow sensor, condense

r

24

Pressure gauge

77

Accessories, water/water booste

r

BT19

Sensor, electric heating cartridg

e

25

H domestic hot water circulation pump (HUP

)

78

Scope of supply, water/water booster, optiona

l

BT24

Sensor, additional heat generato

r

26

Changeover valve, domestic hot water (BUP)(B = normally open

)

27

Heating element, h domestic hot water (ZWE

)

28

Brine circulation pump (VBO

)

Additional circuit board:

29

Dirt trap (max. 0.6 mm screen size

)

15

Mixing circuit, three-way mixer (MK2-3 discharging

)

30

Collection container for brine mixtur

e

100

Room thermostat, cooling accessories, optional

17

Temperature difference control (SLP

)

31

Wall penetration

101

Control on site

19

Mixing circuit, four-way mixer (MK2 charging

)

32

Supply pip

e

102

Dew point monitor, optional accessorie

s

21

Mixing circuit circulation pump (FP2-3

)

33

Brine distributo

r

103

Room thermostat, cooling, included in scope of suppl

y

22

Swimming pool circulation pump (SUP

)

34

Horizontal ground collecto

r

104

Heat pump scope of suppl

y

44

Three-way mixer (cooling function MK2

)

35

Borehole heat exchanger (vertical collector

)

105

Cooling circuit module box, removabl

e

47

Changeover valve, swimming pool heating (SUP)(B = normally open

)

36

Groundwater well pum

p

106

Specific glycol mixtur

e

60

Changeover valve, cooling mode (B = normally open

)

37

Wall bracket

107

Scalding protection / thermal mixing valv

e

62

Heat mete

r

38

Flow switch

108

Solar pump group

63

Changeover valve, solar circuit (B = normally open

)

39

Supply well

109

Overflow valve must be closed

64

Cooling circulation pum

p

40

Discharge well

110

Hydraulic tower scope of suppl

y

70

Separate solar station

41

Flushing fitting, heating circui

t

111

Holder for additional heating elemen

t

TB2-3/C

Flow sensor, mixing circuit 2-

3

42

Circulation, circulation pump (ZIP

)

112

Minimum distance for thermal decoupling of the mixing valv

e

TSS/E

Sensor, temperature difference control (low temperature

)

43

Brine/water heat exchanger (cooling function

)

TSK/E

Sensor, temperature difference control (high temperature

)

44

Three-way mixer (cooling function MK1

)

TEE/F

Sensor, external energy sourc

e

45

Cap valve

46

Fill and drain valve 

48

Domestic hot water charging circulation pump (BLP

)

49

Groundwater flow directio

n

50

Buffer tank, heating

Important note!

These hydraulic diagrams are schematic representations and are designed to help you! They do not release you from the need to c

arry out your own planning & design! Shut-off devices, vent valves and safety measures 

are not drawn in full in these diagrams! The local country-specific standards, laws and regulations must be followed! The pipes

 must be dimensioned according to the nominal volume flow rate of the heat pump or the free 

pressure of the integrated circulation pump! For detailed information and advice please contact the sales partner responsible f

or your area!

Summary of Contents for LWDV

Page 1: ...UK Operation manual LWDV Air water heat pumps Dual outdoor installation 83055800cUK Translation of the operating manual...

Page 2: ...11 8 Flushing filling and venting 12 8 1 Heating water quality 12 8 2 Flushing filling and venting the heating circuit 12 9 Insulation of hydraulic connections 12 10 Setting the overflow valve 12 11...

Page 3: ...Operation manual for the heating and heat pump controller Short description of the heat pump controller Operation manual for the extension board acces sory Operation manual for the hydraulic unit 1 3...

Page 4: ...juries and material damage Ensure that personnel are familiar with local regu lations especially those relating to working safely and in awareness of the hazard risks Have work on the electrical and e...

Page 5: ...ater heating systems Professional planning and commissioning Closed system with regard to corrosion Integration of an adequately dimensioned pres sure maintenance Use of demineralized water heat ing w...

Page 6: ...field installation an extension set can be ordered 3 3 Function Liquid refrigerant is evaporated evaporator The en ergy for this process is ambient heat coming from the outside air The gaseous refrig...

Page 7: ...ent washing up liquid neutral cleaning agent Do not use any aggressive abrasive acid or chlorine based cleaning agents 5 Delivery storage transport and installation ATTENTION Damage to the housing and...

Page 8: ...must be routed through a separate cable con duit separated from the other cables The other two cables also have to be routed using empty conduits on site NOTE The noise immissions of the heat pumps m...

Page 9: ...oad bearing walls In a timber frame construction with facing the floor bracket should be used due to the possible trans fer of structurally borne sound to the interior 5 6 Installation on a floor brac...

Page 10: ...must be ensured 2 Towards the inside Insert the condensate pipe wall duct accessory through the wall duct accessory using lubricant and connect it to the condensate nozzle using the enclosed plastic...

Page 11: ...c information relating to the electrical connection Any specifications by the local energy supply com pany apply to electrical connections Equip the power supply for the heat pump with an all pole min...

Page 12: ...ble to control individual circulation pumps and even the changeover valve via the venting programme As a result it is not necessary to remove the valve motor 1 Vent the system at the highest point 2 V...

Page 13: ...ergy supply company has been notified of the operation of the heat pump system 9 9 The system is air free 9 9 Installation check using the rough checklist has been completed successfully 1 Ensure that...

Page 14: ...fter flushing the condenser with chemical clean ing agent neutralise any residues and flush the condenser thoroughly with water 13 Malfunctions Read out the cause of the malfunction via the di agnosti...

Page 15: ...e min I max l h General unit data Total weight kg Weight of heat pump module I Compact module I Fan module kg I kg I kg Refrigerant type Refrigerant capacity kg Electrics Voltage code all pole fuse pr...

Page 16: ...maler Druckverlust Qh min max minimale maximale Heizleistung Pe min max Leistungsaufnahme bei minimaler maximaler Heizleistung Bezeichnung Seite 1 Zeichnungsnummer 823296 Datei 823296 Leistungs Druckv...

Page 17: ...0 C C 4x M8 IG 6 Legende D819504 Alle Ma e in mm A Vorderansicht B Seitenansicht von links C C Schnitt Grundplatte Technische nderungen vorbehalten A B 5 4 3 2 1 A B C D E F Schutzvermerk ISO 16016 be...

Page 18: ...befinden Der Schutzbereich darf sich nicht auf Nachbargrundst cke oder ffentliche Verkehrsfl chen erstrecken Die Wanddurchf hrung durch die Geb udeh lle ist gasdicht auszuf hren Abbildung Sicherheits...

Page 19: ...ry 8 Cladding of wall duct accessory 1320 930 300 93 FS 1800 A 1 2 X C W Y V UKG OKB 4 5 3 510 445 200 430 400 FS 800 FS 800 FS 1650 282 LR LRO FA 6 4 5 3 8 Legende 819393 1c Technische nderungen vorb...

Page 20: ...r 8 Verkleidung Wandkonsole Zubeh r 12 Hydraulische Verbindungsleitung V2 5 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F 4 3 2 1 c b a Zust nderungstext PEP 006 2011 PEP 003 2012 M 063 2...

Page 21: ...lauf siehe Bedienungsanleitung 7 Konsole f r Bodenbefestigung Zubeh r 8 Verkleidung Wanddurchf hrung Zubeh r Y X V 5 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F 4 3 2 1 c b a Zust nderun...

Page 22: ...eidung Bodenkonsole Zubeh r 12 Hydraulische Verbindungsleitung V4 Y Z A C V 5 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F 4 3 2 1 c b a Zust nderungstext PEP 006 2011 PEP 003 2012 M 063...

Page 23: ...icht W Detailansicht Wandbefestigung GK Ger tekontur 9 Bohrung f r Leerrohr KG DN125 a 125 10 Befestigungsbohrungen f r Wandkonsolen A 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F Key 819...

Page 24: ...gswand zu V2 A Vorderansicht W Detailansicht Wandbefestigung GK Ger tekontur 10 Befestigungsbohrungen f r Wandkonsolen A BB2 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F Drill template fo...

Page 25: ...t 14 Kondensatablaufrohr min 50 15 Befestigungsbohrungen f r Bodenkonsole Das Fundament darf keinen K rperschallkontakt zum Geb ude haben A C 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F...

Page 26: ...wasser Vor und R cklaufleitung A Z Das Fundament darf keinen K rperschallkontakt zum Geb ude haben 18 5 4 3 2 1 Schutzvermerk nach ISO 16016 beachten A B C D E F 4 3 2 1 c b a Zust nderungstext PEP 00...

Page 27: ...in mm FW2Functionally necessary minimum clearances C Top view FA Complete external facade LR Direction of air Minimum clearances 3000 3000 C LR FA FW2 Legende 819393 10c Technische nderungen vorbehal...

Page 28: ...ged frost free in all cases figure 1a and figure 1b 0 9m KS 3 0 9m 1b 3 1c 3 1a Legende 819400 1 Technische nderungen vorbehalten Aufstellungshinweise f r Anschlu der Kondensatleitung au erhalb des Ge...

Page 29: ...ured that the condensate is discharged frost free in all cases figure 2a 2a 2b Legende 819400 2 Technische nerungen vorbehalten Aufstellungshinweise f r Anschlu der Kondensatleitung innerhalb des Geb...

Page 30: ...30 Subject to technical amendments without prior notice 83055800cUK Translation of the operating manual ait deutschland GmbH Hydraulic integration with hydraulic station...

Page 31: ...31 Subject to technical amendments without prior notice 83055800cUK Translation of the operating manual ait deutschland GmbH Hydraulic integration with buffer tank in series and hydraulic module...

Page 32: ...32 Subject to technical amendments without prior notice 83055800cUK Translation of the operating manual ait deutschland GmbH Hydraulic integration of separation buffer tank...

Page 33: ...c hot water ZWE 28 Brine circulation pump VBO Additional circuit board 29 Dirt trap max 0 6 mm screen size 15 Mixing circuit three way mixer MK2 3 discharging 30 Collection container for brine mixture...

Page 34: ...ution box power supply 817449a BP1 F2 BP1 BP2 F1 BP2 BP T10 F3 RF1 R20 C1 X8 F6 1 G1 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 3 3 4 5 6 7 AIT 817449 Stromlaufplan ait deutschland GmbH...

Page 35: ...board Attention I max 6 3A 230VAC Defrosting valve Control voltage From hydraulic module 817449a K40 X1 X2 K21 1 2 3 4 5 6 7 8 1 2 8 A B C D E F Bl 3 4 5 6 7 AIT 817449 Stromlaufplan ait deutschland G...

Page 36: ...denser Sump heating sensor Heat source input sensor Hot gas sensor Suction sensor evaporator Encoding resistor R4 817449a R5 R9 21 5kOhm K22 X6 B10 X8 B11 X10 X11 1 2 3 4 5 6 7 8 A B C D E F A B C D E...

Page 37: ...37 Subject to technical amendments without prior notice 83055800cUK Translation of the operating manual ait deutschland GmbH...

Page 38: ...38 Subject to technical amendments without prior notice 83055800cUK Translation of the operating manual ait deutschland GmbH...

Page 39: ...3 2014 35 EU 814 2013 2014 30 EU 2014 68 EU EN 378 Designation of the device s 100699HDV901 100699HSDV901 100699HSDV1201 100699HDV1201 100 699 01 100 699 01 100 699 01 100 699 01 Unit model Item numbe...

Page 40: ...ait deutschland GmbH Industriestrasse 3 95359 Kasendorf Germany E info alpha innotec de W www alpha innotec de alpha innotec an ait deutschland GmbH brand UK...

Reviews: