21
We reserve the right to modify technical specifications without prior notice.
UK830502/190901
© Alpha-InnoTec GmbH
Seal empty pipes on unit side…
Screw facing panels onto the heat pump.
NOTICE.
Electric heating element is connected for
6 kW (9 kW) at factory. It can be connect-
ed for 2(3) or 4 kW (6 kW) on the contac-
tor K5 (K6).
For further information, see the adhesive label
on the electric heating element.
-8w5)306()-8w
Proceed as follows:
Screw control and sensor wires to the two connec-
tors on the side of the electric switch cabinet…
Guide control and sensor wires inside the unit
through the provided cable duct to the water con-
nection side…
1 Cable duct for control
and sensor wires
Guide control and sensor wires out of the unit…
NOTICE.:
In order to enable unhinging of the electric
switch cabinet in the event that customer
service is necessary, the control and sen-
sor wires in the heat pump must have an
excess length of about 15 cm.
Install control and sensor wires in a conduit as far
as where they enter the building and from there on
to the heating and heat pump regulator…
Connect control and sensor wires to the heating
and heat pump regulator according to the terminal
connection diagram and the circuit diagrams for the
respective model…
“Terminal diagrams” and “Circuit diagrams” for
the respective model.
Operating manual of the heating and heat pump
regulator.
Seal empty pipes on unit side…
Screw facing panels onto the heat pump…
Place lower facing panels diagonally into the frame,
close at top and fasten with in quick-release
screws…
The unit is now closed.