2. Check if any cables/wires are showing signs of ageing or have been damaged.
3. Check whether any cable securing ties have fallen off within the system enclosure.
4. Check to confirm whether all cable terminations are secure, and terminal connections haven’t
got any signs of overheating.
5. Monitor the voltage, temperature and events on the EMS module, and see if the BLMU's
collection line, connection terminal, terminal block, communication line connection are secure
and not damaged.
6. Check whether the EMS module of the system equipment, monitoring system and other
related equipment are the correct component/module, correctly fitted and not damaged at all.
7. Check that the grounding/bonding of the equipment is adequate, the grounding/bonding
resistance should be less than 4 ohms.