___________________________________________________________________
Alpha ESS Co., Ltd.
Page 62
Your Smart Energy
Routine Maintenance
5.9
Check after commissioning
The enduser can login their account and check the settings & firmware version after commissioning
at following interface .
6.
Routine Maintenance
6.1
Maintenance Plan & checklist
➢
Check if wire connections are loose.
➢
Check if cables are aged/damaged.
➢
Check if cable insulating ribbon drops.
➢
Check if cable terminal screw loose, any overheat sign.
➢
Check if ground connection is well.