Expandability

– Thanks to expansion bus, the ALPTEC can be expanded with one EXT… series module.
– To insert an Extansion module:

• Remove the power supply to ALPTEC.

Remove the protecting cover of the Extansion slot.

Insert the upper hook of the module into the fixing hole on the top of the expansion slot.

Rotate down the module body, inserting the connector on the bus

Push until the bottom clip snaps into its housing.

– When the ALPTEC is powered on, it automatically recognises the EXT module that has been mounted.
– The expansion modules provide additional resources that can be used through the dedicated setup menus.
– The setup menus related to the expansions are always accessible, even if the expansion modules are not physically fitted
– The following table indicates which models of expansion modules are supported

Module Type

Code

Function

ADDITIONAL STEPS

Ext2Gr

2 STEP RELAYS

COMMUNICATION

ExtRS485

RS–485

IR programming port

– The parameters of the ALPTEC can be configured through the front optical port, using the IR-USB code CX01 programming dongle, or with the

IR-WiFi code CX02 dongle.

– This programming port has the following advantages:

• You can configure and service the ALPTEC without access to the rear of the device or having to open the electrical panel.
• It is galvanically isolated from the internal circuits of the ALPTEC, guaranteeing the greatest safety for the operator.
• High speed data transfer.
• IP54 front panel protection.
• Limits the possibility of unauthorized access with device config, since it is necessary to have the CX01 or CX02 dongles.

– Simply hold the CX.. dongle up to the front panel, connecting the plugs to the relevant connectors, and the device will be acknowledged as shown

by the LINK LED on the programming dongle flashing green.

USB programming dongle code CX01

WiFi programming dongle code CX02

Parameter setting (setup) with PC

– You can use the Alptec Remote control software to transfer (previously programmed) set-up parameters from the ALPTEC to the hard drive of the

PC and vice versa.

– The parameter may be partially transferred from the PC to the ALPTEC, transferring only the parameters of the specified menus.

2014-AT3-5-01-ANG.indd 5

20/03/14 11:46

Summary of Contents for ALPTEC 3.2

Page 1: ...stalled by qualified personnel complying to current standards to avoid damages or safety hazards Before any maintenance operation on the device remove all the voltages from measuring and supply inputs...

Page 2: ...ble 2 level password protection for settings Backup copy of original commissioning settings Built in temperature sensor Tool less panel mount Display indications Introduction The ALPTEC automatic powe...

Page 3: ...en when the power supply voltage is removed When the power returns the original state of the steps is restored Select step Change step status MAN mode icon Connected steps Tot kvar inserited in MAN Ma...

Page 4: ...stortion THD of plant voltage VH02 VH1 5 voltage harmonic content from 2 nd up to 15 th order Current THD THDI Total harmonic distortion THD of plant current IH02 IH15 Current harmonic content from 2...

Page 5: ...ured through the front optical port using the IR USB code CX01 programming dongle or with the IR WiFi code CX02 dongle This programming port has the following advantages You can configure and service...

Page 6: ...tom menu non available on this version EXIT Exits without saving cancel SAVE Exits saving modifications Press MAN AUT to access the submenu When you are in a submenu the main display shows the code of...

Page 7: ...acters available The parameter code can be used however as a reference Note The parameters shown in the table with a shaded background are essential to the operation of the system thus they represent...

Page 8: ...With small values of P 10 the regulation is fast more accurate around the setpoint but with more step swithchings With high values instead we ll have slower reactions of the regulation with fewer swit...

Page 9: ...vanced level access P 24 Number of phases of the power correction panel P 25 Enables the measurement of the actual power of the step performed each time they are switched in The measure is calculated...

Page 10: ...ctually inserted with reference to the total reactive power installed in the panel Curr act nom Percentage of actual plant current with reference to the maximum current of the CT Delta kvar bar graph...

Page 11: ...rm activation A12 Adv ALA OFF ON ALA DISC A D P 95 Alarm delay A12 Adv 0 0 240 P 96 Delay UoM A12 Adv Sec Min Sec P 97 Alarm activation A13 Adv A D OFF ON ALA DISC A D P 98 Alarm delay A13 Adv 5 0 240...

Page 12: ...er than minimum measuring range The plent should be off load A04 Current too high The current flowing in the current inputs is higher than maximum measuring range A05 Voltage too low The measured volt...

Page 13: ...o execute the selected command The unit will prompt for a confirmation OK Press once again MAN AUT to confirm or MODE to cancel The following table lists the possible commands COD COMMAND DESCRIPTION...

Page 14: ...N P 24 1PH NOTES IMPORTANT The polarity of the current voltage input is indifferent Configuration with MV measurement and correction on LV side Typical diagram do not represent the internal connexion...

Page 15: ...rrent Ie 1 AA or 5 AA Measuring range for 5A scale 0 025 6AA for 1A scale 0 025 1 2AA Type of input Shunt supplied by an External current transformer low voltage Max 5A Measuring method True RMS Overl...

Page 16: ...0 56 Nm 5 LBin Housing Version Flush mount Material Polycarbonate Degree of protection IP54 on front IP20 terminals Weight 350g Certifications and compliance cULus Pending Reference standards IEC EN...