Installation

– ALPTEC is designed for flush-mount installation. With proper mounting, it guarantees IP54 front protection.

– From inside the panel, for each four of the fixing clips, position the clip in one of the two sliding guide, then press on the clip corner until the second guide

snaps in.

– Push the clip forward pressing on its side and making it slide on the guides until it presses completely on the internal surface of the panel.

– For the electrical connection see the wiring diagrams in the dedicated chapter and the requirements reported in the technical characteristics table.

CX02 Dongle usage

– The Cx02 dongle offers WiFi Access point capability for connection to PC, Tablet or smartphones. In addition to this function it also offer the possibility to

store and transfer a block of data from/to the DCRL.

– Insert the interface Cx02 into the IR port of DCRL on the front plate.

– Switch Cx02 on by pressing the button for 2 sec.

– Wait until the LINK LED becomes orange flashing.

– Press 3 times consecutively and fast the dongle button.

– At this point the display of the DCRL shows the first of the 6 possible commands (D1…D6).

– Press

▲ ▼

to select the desired command.

– Press MAN-AUT to execute the selected command. The unit will prompt for a confirmation (OK?). Press once again MAN-AUT to confirm or MODE to cancel.

– The following table lists the possible commands:

COD

COMMAND

DESCRIPTION

D1

SETUP DEVICE

Cx02

Copies Setup settings from DCRL to Cx02.

D2

SETUP Cx02

DEVICE

Copies Setup settings from Cx02 to DCRL.

D3

CLONE DEVICE

Cx02

Copies Setup settings and working data from DCRL to Cx02.

D4

CLONE Cx02

DEVICE

Copies Setup settings and working data from Cx02 to DCRL.

D5

INFO DATA Cx02

Shows information about data stored into Cx02.

D6

ExIT

Exits from dongle menu.

For additional details see Cx02 Operating manual

Wiring diagrams

WARNING! Disconnect the line and the supply when operating on terminals.

Standard Three-phase wiring

Typical diagram - do not represent the internal connexion of our capacitor banks

THREE-PHASE CONNECTION TYPE “A” – P.11 set to A.con (default)

Default wiring configuration for standard applications.
Voltage measure

1 ph-to-ph voltage reading L1-L2

Current measure

L3 phase

Phase angle offset

Between V (L1-L2 ) and I (L3)

90°

Capacitor overload current measure

1 reading calculated on L1-L2

Parameter setting

P.03 = L3

P.05 = L1-L2

P.24 = 3PH

NOTES : – For three-phase connection, the voltage input must be connected phase to phase; the current transformer must be connected on the remaining phase.

– The polarity of the current/voltage input is indifferent.

2014-AT3-5-01-ANG.indd 13

20/03/14 11:46

Summary of Contents for ALPTEC 3.2

Page 1: ...stalled by qualified personnel complying to current standards to avoid damages or safety hazards Before any maintenance operation on the device remove all the voltages from measuring and supply inputs...

Page 2: ...ble 2 level password protection for settings Backup copy of original commissioning settings Built in temperature sensor Tool less panel mount Display indications Introduction The ALPTEC automatic powe...

Page 3: ...en when the power supply voltage is removed When the power returns the original state of the steps is restored Select step Change step status MAN mode icon Connected steps Tot kvar inserited in MAN Ma...

Page 4: ...stortion THD of plant voltage VH02 VH1 5 voltage harmonic content from 2 nd up to 15 th order Current THD THDI Total harmonic distortion THD of plant current IH02 IH15 Current harmonic content from 2...

Page 5: ...ured through the front optical port using the IR USB code CX01 programming dongle or with the IR WiFi code CX02 dongle This programming port has the following advantages You can configure and service...

Page 6: ...tom menu non available on this version EXIT Exits without saving cancel SAVE Exits saving modifications Press MAN AUT to access the submenu When you are in a submenu the main display shows the code of...

Page 7: ...acters available The parameter code can be used however as a reference Note The parameters shown in the table with a shaded background are essential to the operation of the system thus they represent...

Page 8: ...With small values of P 10 the regulation is fast more accurate around the setpoint but with more step swithchings With high values instead we ll have slower reactions of the regulation with fewer swit...

Page 9: ...vanced level access P 24 Number of phases of the power correction panel P 25 Enables the measurement of the actual power of the step performed each time they are switched in The measure is calculated...

Page 10: ...ctually inserted with reference to the total reactive power installed in the panel Curr act nom Percentage of actual plant current with reference to the maximum current of the CT Delta kvar bar graph...

Page 11: ...rm activation A12 Adv ALA OFF ON ALA DISC A D P 95 Alarm delay A12 Adv 0 0 240 P 96 Delay UoM A12 Adv Sec Min Sec P 97 Alarm activation A13 Adv A D OFF ON ALA DISC A D P 98 Alarm delay A13 Adv 5 0 240...

Page 12: ...er than minimum measuring range The plent should be off load A04 Current too high The current flowing in the current inputs is higher than maximum measuring range A05 Voltage too low The measured volt...

Page 13: ...o execute the selected command The unit will prompt for a confirmation OK Press once again MAN AUT to confirm or MODE to cancel The following table lists the possible commands COD COMMAND DESCRIPTION...

Page 14: ...N P 24 1PH NOTES IMPORTANT The polarity of the current voltage input is indifferent Configuration with MV measurement and correction on LV side Typical diagram do not represent the internal connexion...

Page 15: ...rrent Ie 1 AA or 5 AA Measuring range for 5A scale 0 025 6AA for 1A scale 0 025 1 2AA Type of input Shunt supplied by an External current transformer low voltage Max 5A Measuring method True RMS Overl...

Page 16: ...0 56 Nm 5 LBin Housing Version Flush mount Material Polycarbonate Degree of protection IP54 on front IP20 terminals Weight 350g Certifications and compliance cULus Pending Reference standards IEC EN...

Reviews: