Almost Heaven Saunas Bluestone Sauna Owners And Installation Manual Download Page 3

3

 

1. Connect the 4 FLOOR RISERS

 

Your existing floor will serve as 
the floor for your sauna. The pre

-

fabricated rails and risers will be 
placed on your existing floor and 
provide the structural support for 
the sauna room. The 4 floor risers 
are pre

-

drilled and are assembled 

with 2” screws.  Use a framing 
square to be sure the assembled 
frame is square.

 

NOTE: 

Be sure your surface is flat 

before you begin assembly.

 

2. Connect the WALL SUPPORT 
RAILS with groove facing up

 

The 4 wall support rails are as-
sembled with 2” screws.  Use a 
framing square to be sure the 
frame is square.  Draw the cor-
ners tight by angle screwing the 
corners together.

 

NOTE: 

One side of each rail is pre

-

drilled. After lining up the rails 
and prior to screwing them to-
gether, it is suggested that you 
pre

-

drill through the factory

-

drilled pilot hole into the second 
rail using a 1/8” drill bit. Drill 
about 1” into the second rail. This 
will prevent the possibility of strip

-

ping or breaking the screw. 

 

3. Position and Fasten WALL 
SUPPORT RAILS

 

Place the assembled wall support 
section on the assembled floor 
section; be sure the groove is fac-
ing up. Using 2” screws, attach 
the support rails to the floor ris-
ers.  Use 4 screws for each rail.  

 

The combined riser and rails is 
now called the wall support sec-
tion.

 

ILLUSTRATION 1

 

The 9 wall sections, A– I, will be 
positioned in the grooves of the 
completed wall support section as 
shown.

 

Completed 

 

Wall 

 

Support

 

 

 

A

 

B

 

C

 

D

 

E

 

F

 

G

 

H

 

I

 

Summary of Contents for Bluestone Sauna

Page 1: ...1 Revised October 2017 Bluestone Sauna Installation Owner s Manual...

Page 2: ...l state and local codes and regulations and according to the instructions provided with the heater LOCATING THE SAUNA Your Bluestone Indoor Sauna was specifically designed to utilize your existing flo...

Page 3: ...he corners together NOTE One side of each rail is pre drilled After lining up the rails and prior to screwing them to gether it is suggested that you pre drill through the factory drilled pilot hole i...

Page 4: ...right corner of the sauna according to the guide on ILLUSTRATION 1 NOTE Wall Section C will attach to Wall Section B by way of the tongue and groove profile but will not be fastened with screws 8 Pos...

Page 5: ...e on ILLUSTRATION 1 11 Position WINDOW SECTION H Position Window Section H on the left front of the sauna according to the guide on ILLUSTRATION 1 NOTE Tap sections into place using rubber mallet Be s...

Page 6: ...ed screws per rail NOTE Tap the Roof Support firm ly in place with a rubber mallet so wall sections are fully inserted in to the groove before screwing in to place 15 Position ROOF SECTION First Half...

Page 7: ...ter install the Long Back Rest above the Upper Bench generally 8 12 20 Install LOWER BENCH FRAME Lay the lower bench frame on top of the bench supports Attach to the side and back walls of the sauna u...

Page 8: ...r Supply into any wall outlet and flip the switch mounted on the back of the bench to oper ate the LED light Cord from LED light Power Supply 28 Attach SHORT BACK REST Install Short Back Rest at desir...

Page 9: ...brand may vary depending on where sauna was purchased Install sauna stones in accordance with heater manufacturer instructions Typical wiring requirements for distances of up to 30 feet from the break...

Page 10: ...OR KNOB Take the two sections of the door knob and insert the thread through the hole in the door Tighten so that handles are snug to glass NOTE Hand tighten only and be sure rubber gasket is between...

Page 11: ...e vent located toward the top of the sau na It is important to have adequate fresh air flowing through the sauna and this flow can be adjusted with the movable vent cover TRADITIONAL STEPS IN TAKING A...

Reviews: