Supplied Items

WARNING

THERE  IS  A  SAFETY  ADVISORY 

AGAINST  STANDING  WITHIN  A 

PROXIMITY  OF  12  FEET  (4  METERS) 

OF  THIS  LIGHTNING  PROTECTION  

SYSTEM WHILE AN ELECTRIC STORM 

TerraStreamer® TSP 

ESE Terminal

Adaptor

Warning Label (2)

Warranty Card

W A R R A N T Y   R E G I S T R AT I O N   A N D   S TAT E M E N T   O F   C O M P L I A N C E

The warranty is limited to the cost of replacement of equipment providing it has been installed and/or certified by ALLTEC or its authorized 
distributor. ALLTEC shall in no event be responsible for any loss of business or profits, downtime or delay, labor, repair or material costs or 
any similar or dissimilar consequential loss or damage incurred by the buyer. All other costs such as: insurance premiums, freight charges, 
loss of profit, and re-installation of equipment are not included. Also specifically excluded from the warranty is any responsibility for other 
direct or indirect damages or death. ALLTEC shall in no event be responsible if the products have not been stored or used in accordance with 
its specifications and recommended procedures (See complete warranty statement for further details).

TerraStreamer

®

 products require project specific lightning protection design and installation. Inappropriate use of these products, or use 

in designs not provided by or approved by ALLTEC will invalidate performance characteristics and all Warranty Provisions.

TerraStreamer

®

 ESE Terminals are guaranteed against defects in workmanship and materials for a period of 5 years from the original date 

of sale when purchased from ALLTEC or one of its authorized distributors. 

TerraStreamer

®

 ESE Terminals shall be installed and used only 

as  indicated  in  ALLTEC’s  product  installation  manual  and  according  to  UNE  21  186  or  NF  C  17-102  standards.  Improper  installation, 
mishandling,  misapplication  or  other  failure  to  completely  follow  ALLTEC’s  instructions  and  warnings  may  cause  product  malfunction, 
property damage, serious bodily injury or death. 

TerraStreamer

®

 systems should only be installed during storm free periods.

Neither 

TerraStreamer

®

 ESE systems nor any other lightning protection system can provide 100% protection from lightning.  We refer to 

the French Standard NF C 17-102: “As in the case with anything related to the natural elements, a lightning protection system designed and 
installed in accordance with the standard, cannot guarantee absolute protection to structures, persons or objects: however, applying this 
standard will significantly reduce the risk of protected structures being damaged by lightning.”

System Installed - Model Type: 

Serial #s:

# of Terminals:

Type, size and length of down conductor:

Protective Radius Obtained:

NF C 17-102

UNE 21 186 

Ground Resistance Reading:

Failure to perform installation and maintenance as per Alltec’s recommendations automatically

voids all warranty conditions.

For Warranty registration, please complete the above and mail to ALLTEC within 30 days of installation (see reverse side)

Name of Project:

Address:

Type of Structure:

Installation Date: 

 

Installation Contractor: 

Inspected by:

Inspection Date:

Alltec Distributor:

Important Notice:

TerraStreamer

®

 ESE System

Project Information

W A R N I N G

W A R R A N T Y

Quality Certificate (Front)

Warranty Statement (Back)

www.alltecglobal.com

ALLTEC - Solution Providers for an Energized World | 64 Catalyst Drive | Canton, North Carolina 28716 USA | +1.828.646.9290

© 2014 ALLTEC

Q U A L I T Y   C E R T I F I C AT E

Quality Control Verification Parameters:

TSP-20

Company Stamp:

Signed:

Date:

Triggering Time Advance (

T) = 22µs

Accredited High Voltage Testing:

Product Assembly Verification:

Packaging Quality Verification:

Installation Guide Supplied:

Warning Labels (Qty 2) Supplied:

Warranty Certificate Supplied:

Results & Serial Number Archived:

TSP-30

Triggering Time Advance (

T) = 32µs

TSP-40

Triggering Time Advance (

T) = 44µs

TSP-50

Triggering Time Advance (

T) = 55µs

TSP-60

Triggering Time Advance (

T) = 61µs

Serial No:

Model: 

TerraStreamer

®

EARLY STREAMER EMISSION TERMINALS

This is to certify the above product is manufactured to a design achieving a triggering time (

Δ

T) as 

stipulated above in accordance with NF C 17-102 and UNE 21 186.

This document further certifies that this unit meets or exceeds all Quality Control parameters as 
established by Alltec, and that Electrical Testing according to the above International Standards has 
independently verified performance, as documented by a fully Accredited Laboratory.

Summary of Contents for TerraStreamer TPV-60

Page 1: ...TerraStreamer Early Streamer Emission Terminals Installation Instruction Guide MODELS TSP 20 TSP 30 TSP 40 TSP 50 TSP 60 TPV 60...

Page 2: ...aStreamer ESE Post Installation Verification 18 7 Inspection Maintenance 18 Schedule 18 Checklist 18 Disclaimer 19 Warranty The warranty is limited to the cost of replacement of equipment providing it...

Page 3: ...protection system can provide 100 protection from lightning We refer to the French Standard NF C 17 102 As in the case with anything related to the natural elements a lightning protection system desig...

Page 4: ...eld which is present with approaching thunderstorms and become active only during storm activity The system operates without the need for external power supply or spare parts for standard operation To...

Page 5: ...20 25 30 32 3 24 30 37 44 48 4 31 40 50 59 63 5 39 50 62 73 79 6 40 50 62 74 79 8 40 51 63 74 79 10 41 51 63 74 80 Level II 2 18 23 28 32 35 3 27 35 42 48 52 4 36 47 55 64 70 5 45 58 69 80 87 6 47 58...

Page 6: ...mping sites etc they should be installed on specific supports such as tower mast lightning poles pylons or any other nearby structures which enable the ESE Terminal to cover the area to be protected T...

Page 7: ...r to connection to the grounding system or immediate connection is not possible connect the lower end of the down conductor to structural steel reinforcing or other suitable grounding point Before ins...

Page 8: ...undation loop ground P Grounding system Radial Delta Fig B Recommended Grounding Configurations 1 Installation of the Grounding System Each radial should consist of a trench approx 50cm deep x 20cm wi...

Page 9: ...lowed NF C 17 102 requirements should be strictly adhered to as regards materials and design requirements for number and placement of TerraStreamer ESE Terminals and down conductors The route of the d...

Page 10: ...SE terminals are located on the same building the down conductors shall be mutualized on a case by case basis but a minimum of one down conductor is mandatory for each ESE terminal When a natural comp...

Page 11: ...d radius is maintained never less than 20 cm DO NOT double the down conductor back against itself after changes of direction i e 180 bend The down conductor should be installed as close flush as possi...

Page 12: ...stem through the use of a suitable ground rod clamp or by using TerraWeld exothermic welding Exterior Wall 1m Minimum Ground Rod Clamp or Exothermic Weld Ground Rod Minimum 16mm Diameter x 3m length 5...

Page 13: ...strip Round stranded copper wire is inserted into the hole in the base of the adaptor and secured with the two screws provided Flat copper strip attaches to the external flat side of the adaptor Terra...

Page 14: ...priate safety railings It is very important to keep the mast straight during the lift to avoid damaging the mast The TerraStreamer ESE Terminal must NOT be used as a slinging point When lifting masts...

Page 15: ...ESE Terminal Strike Counter Inspection Well Grounding System FRP Mast Mast Base Guy Ring Guy Wire Fig H Mid Roof location TerraStreamer ESE Terminal Strike Counter Inspection Well Grounding System FR...

Page 16: ...cal point somewhere along the length of the mast Particular care should be taken to ensure that compatible metals are used when connecting the down conductor to metallic masts e g aluminum to copper c...

Page 17: ...ion along the down conductor length where it can be accessed easily for inspection Typically the strike counter should be installed approximately 2m from ground level The strike counter should be moun...

Page 18: ...tenance Alltec recommends inspection and any required maintenance to be performed regularly and as listed below Schedule After each known lightning strike to the terminal Once every twelve months mini...

Page 19: ...SE Terminal nor any other lightning protection system to our knowledge can provide 100 protection from lightning In order to provide the most effective Early Streamer Emission ESE Air Terminal technol...

Page 20: ...www alltecglobal com WORLD HEADQUARTERS 64 Catalyst Drive Canton North Carolina 28716 USA TEL 1 828 646 9290 FAX 1 828 412 4270 EMAIL info alltecglobal com 2017 ALLTEC 420 001 11 22 2017...

Reviews: