x530L Series Installation Guide for Virtual Chassis Stacking
121
Installing the x530L-18GHXm, x530L-28GTX
,
x530L-28GPX, x530L-
52GTX, or
x530L-52GPX
Switch in an Equipment Rack
This section contains the procedure for installing the x530L-18GHXm,
x530L-28GTX, x530L-28GPX, x530L-52GTX, or x530L-52GPX Switch in a
standard 19-inch equipment rack using the brackets supplied with the unit.
Required Items
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Switch
Orientations in
the Equipment
Rack
The switch has two sets of four screw holes on the left and right sides, for
attaching the brackets. Refer to Figure 64.
Figure 64. Bracket Holes on the Switch
4581
4568
3
5
1
7
9
11
13
15
17
19
21
23
27/S1
28/S2
25
SFP+
26
A
T-x530L-28GTXm
16
18
20
14
10G
/
1G
4
6
8
10
12
2
22
24
FDX
HDX COL
1G LI
NK
AC
T
100 LINK
AC
T
5G/2.5G/1G LINK
AC
T
100 LINK
AC
T
POR
TS 21-2
4
POR
TS
1-20
5G/2.5G/1G/100
CLASS
1
LASER PRODUC
T
CONSOLE
Bracket Holes
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...