8
SwitchBlade Power Supply Unit
C613-04028-01 REV B
How Many PSUs Do You Need?
The number of PSUs required depends on how many bays are in use.
If any five bays are in use (one switch controller bay and four line card bays, or
two switch controller bays and three line card bays), one PSU is sufficient.
Installing a second PSU provides
N+1
redundancy.
If six or more bays are in use (one switch controller bay and five line card bays,
or two switch controller bays and four line card bays), two PSUs are required.
In this case, installing a third PSU in the SwitchBlade CH8 chassis provides
N+1
redundancy.
Where To Find More Information
Sources of further information:
■
The Documentation and Tools CD-ROM bundled with every switch
controller and every chassis, which contains the complete Documentation
Set for your switch and its expansion options, as well as tools for managing
the switch.
■
The
SwitchBlade Safety and Statutory Information
Booklet, which provides
safety and statutory information for the SwitchBlade and its accessories.
■
The
SwitchBlade Hardware Reference
, which provides detailed information
on the switch and its hardware features.
■
The
SwitchBlade Software Reference
, which provides detailed information on
configuring the switch and its software.
■
The
SwitchBlade Chassis and Fan Tray Quick Install Guide
, which outlines the
procedure for installing the chassis and its fan tray.
■
The
SwitchBlade Switch Controller Quick Install Guide
, which outlines the
procedure for installing switch controllers.
■
The
SwitchBlade Line Card Quick Install Guide
, which outlines the procedure
for installing line cards.
■
The
SwitchBlade Bandwidth Expander Quick Install Guide
, which outlines the
procedure for installing bandwidth expanders.
■
The
CAM Quick Install Guide,
which outlines the procedure for installing
Content Addressable Memory.
■
www.alliedtelesyn.co.nz/support/switchblade/