
Chapter 3: Installing the Switch
81
Figure 27. Marking the Locations of the Bracket Holes on a Concrete Wall
5. Place the switch on a table or desk.
6. Use a drill and 1/4” carbide drill bit to pre-drill the four holes you
marked in step 3. Please review the following guidelines:
Prior to drilling, set the drill to hammer and rotation mode. The
modes break up the concrete and clean out the hole.
Allied Telesis recommends cleaning out the holes with a brush or
compressed air.
7. Insert four anchors (not provided) into the holes.
8. Have another person hold the switch at the selected wall location while
you secure it with four screws (not provided). Refer to Figure 28 on
page 82.
Summary of Contents for IE340 Series
Page 10: ...IE340 Series Installation Guide 10...
Page 14: ...Tables 14...
Page 18: ...IE340 Series Installation Guide 18...
Page 52: ...IE340 Series Installation Guide 52...
Page 62: ...IE340 Series Installation Guide 62 Figure 13 Space Issue Between SFP Module and Copper Port...
Page 68: ...IE340 Series Installation Guide 68...
Page 86: ...IE340 Series Installation Guide 86...
Page 94: ...IE340 Series Installation Guide 94...