
Appendix A: Technical Specifications
129
Note
The switch does not require an enclosure when installed in most
indoor environments. However, the switch must be installed in a UL
Listed or Nationally Recognized Test Lab enclosure when used in an
indoor Measurement, Control, or Laboratory environment, as
specified in UL/EN/IEC 61010-1 and 61010-2-201.
Note
The IE340L-18GP switch is not compliant with UL/EN/IEC 61010-1
and 61010-2-201 and should not be used in an indoor
Measurement, Control, or Laboratory environment.
Summary of Contents for IE340 Series
Page 10: ...IE340 Series Installation Guide 10...
Page 14: ...Tables 14...
Page 18: ...IE340 Series Installation Guide 18...
Page 52: ...IE340 Series Installation Guide 52...
Page 62: ...IE340 Series Installation Guide 62 Figure 13 Space Issue Between SFP Module and Copper Port...
Page 68: ...IE340 Series Installation Guide 68...
Page 86: ...IE340 Series Installation Guide 86...
Page 94: ...IE340 Series Installation Guide 94...