
Chapter 3: Installing the Switch
77
3. Install the two wall brackets to the back panel of the switch, with the
four screws included with the unit. Refer to Figure 25.
Figure 25. Installing the Wall Brackets on the Switch
4. Have another person hold the switch on the plywood base on the wall
while you secure it with four screws (not provided). Refer to Figure 26
on page 78.
Please follow these guidelines as you position the switch on the wall:
The switch must be oriented as shown in Figure 26. Do not install
the switch horizontally or upside-down.
Be sure to leave sufficient space from other devices or walls to
allow for adequate air circulation around and through the cooling
fins. Refer to “Reviewing Site Requirements” on page 59 for further
information.
Summary of Contents for IE340 Series
Page 10: ...IE340 Series Installation Guide 10...
Page 14: ...Tables 14...
Page 18: ...IE340 Series Installation Guide 18...
Page 52: ...IE340 Series Installation Guide 52...
Page 62: ...IE340 Series Installation Guide 62 Figure 13 Space Issue Between SFP Module and Copper Port...
Page 68: ...IE340 Series Installation Guide 68...
Page 86: ...IE340 Series Installation Guide 86...
Page 94: ...IE340 Series Installation Guide 94...