Chapter 2: Installation
36
6.
Verify that the PWR LED in the front of the chassis is green.
If the PWR LED is OFF, refer to Chapter 3, ”Troubleshooting”
on page 43 for instructions.
The chassis runs a series of self-diagnostic tests, which take
a few seconds to perform. After the self tests are complete,
the chassis is ready for normal network operations.
For cabling instructions, refer to the installation guide that is
shipped with the Allied Telesis media converter.
Pluggable Equipment. The socket outlet shall be
installed near the equipment and shall be easily
accessible.
E5