Chapter 3: Beginning the Installation
62
Hardware Installation Overview
Table 11 lists the general steps to installing the switch hardware.
Table 11. Hardware Installation Procedures
Step
Description
Procedure
1
Review safety precautions.
“Reviewing Safety
Precautions” on page 64
2
Choose locations for the
switches.
“Choosing a Site for the
Chassis” on page 69
3
Unpack the hardware.
“Unpacking the Chassis”
on page 70
“Unpacking AT-
SBxPWRSYS2 AC Power
Supplies” on page 75
“Unpacking AT-
SBxPWRSYS1-80 DC
Power Supplies” on
page 76
4
Install the hardware.
“Adjusting the Equipment
Rack Brackets” on page 79
“Installing the Chassis in an
Equipment Rack” on
page 83
“Installing the Chassis
Grounding Wire” on
page 84
“Installing AT-
SBxPWRSYS2 AC Power
Supplies” on page 87
“Installing AT-
SBxPWRSYS1-80 DC
Power Supplies” on
page 91
Summary of Contents for AT-FAN08
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 38: ...Chapter 1 Overview 38...
Page 60: ...Chapter 2 Virtual Chassis Stacking 60...
Page 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Page 104: ...Chapter 4 Installing the Chassis 104...
Page 140: ...Chapter 5 Powering On the Chassis 140...
Page 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...