![Alliance Laundry Systems LES19A SERIES Service Manual Download Page 19](http://html1.mh-extra.com/html/alliance-laundry-systems/les19a-series/les19a-series_service-manual_2901346019.webp)
505692
19
Section 4 Grounding
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
17. GROUND WIRES FROM REAR BULKHEAD TO TIMER MOUNTING BRACKET AND TO
DRYER CABINET TOP. GROUND WIRES FROM TIMER MOUNTING BRACKET TO GRAPHIC
PANEL.
See Figure 3.
Figure 3
D277SE3A
GROUND
WIRES