34
M412982
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the tumbler before servicing.
• Close gas shut-off valve to gas tumbler before servicing.
• Close steam valve to steam tumbler before servicing.
• Never start the tumbler with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the tumbler is properly grounded.
W002
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
42. STOVE HIGH LIMIT THERMOSTAT
(Gas Models)
a. Remove four screws holding access panel to
cabinet.
b. Lift access panel off top edge of front panel and
pull panel forward.
c. Remove screws holding thermostat cover to
stove. Refer to Figure 10.
d. Remove thermostat cover. Refer to Figure 10.
e. Disconnect wires to thermostat.
f. Remove the two thermostat attaching screws.
g. Remove thermostat.
43. CABINET HIGH LIMIT THERMOSTAT/
LOAD READY THERMOSTAT
(Located on rear of tumbler near fan.)
a. Support drive guard cover and remove screws
holding guard to rear of tumbler. Refer to
Figure 13.
b. Disconnect wires from thermostat.
c. Remove two screws holding thermostat to rear
of tumbler. Refer to Figure 14.
Figure 10
TMB1737P
STOVE
HIGH LIMIT
THERMOSTAT
THERMOSTAT
ATTACHING
SCREWS
SPUDHOLDER
IGNITER
UNION
NUT
GAS
VALVE
SHUT-OFF
VALVE
GAS VALVE
BRACKET