
SECTION 2
ASSEMBLY
068522
Page 24
Assembly Instructions
Installing Cable Tension Kit:
1. Loop dead end of cable through the Hook & Eye
Turnbuckle.
2.
Apply first clip one base width from dead end of
wire rope. U-Bolt over dead end. Live end rests in
clip saddle. Tighten nuts evenly to recommended
torque.
3. Apply second clip as close to loop as possible.
U-Bolt over dead end. Turn nuts firmly but DO NOT
TIGHTEN.
4.
Apply all other clips. Space evenly between first
two and 6-7 rope diameters apart.
5. APPLY TENSION and Tighten all nuts to recom-
mended torque.
6. Check nut torque after rope has been in opertation.
7. Mount End Bracket Assembly to frame of workbridge as shown.
Image of Completed Clamp Assembly
Summary of Contents for WB1824
Page 10: ...SECTION 1 SAFETY 068522 Page 10 SECTION 1 SAFETY ...
Page 20: ...SECTION 2 ASSEMBLY 068522 Page 20 SECTION 2 ASSEMBLY ...
Page 26: ...SECTION 3 PARTS 068522 Page 26 SECTION 3 PARTS ...
Page 31: ...068522 Page 31 SECTION 3 PARTS PAGE LEFT BLANK INTENTIONALLY ...
Page 54: ......
Page 55: ......