
Start-Up Procedure
Before Starting Procedures
Before starting the power sprayer and/or towing check for the following:
1. Oil level in the engine and pump.
2. Fuel level in the fuel tank.
3. Condition of air cleaner on the engine.
4. Coupler is secured and locked to the hitch.
5. Verify that the safety chains are secured to the tow vehicle.
6. Verify that the jack is fully retracted and secured to the trailer.
7. Verify that the trailer lights are properly connected.
8. Verify that the load(s) are secured to the trailer.
Starting Procedures
Unfolding the Spray Boom:
• Before unfolding the boom make sure that the supplied support mast tube and cable are installed.
Install the support mast to the outer most hole on the mounting bracket. Secure the mast tube
with the clevis pin. See Figure 2.3.
Figure 2.3: Support Mast and Cable
Support Mast Tube
Cable
SECTION 2
OPERATIONS
075770
Page 29
Summary of Contents for MPS9910
Page 5: ...075770 Page 5 General Information PAGE LEFT BLANK INTENTIONALLY ...
Page 15: ...SECTION 1 SAFETY SECTION 1 SAFETY 075770 Page 15 ...
Page 25: ...SECTION 2 OPERATIONS SECTION 2 OPERATIONS 075770 Page 25 ...
Page 32: ...SECTION 3 SERVICE SECTION 3 SERVICE 075770 Page 32 ...
Page 33: ...SECTION 2 OPERATIONS 075770 Page 33 PAGE LEFT BLANK INTENTIONALLY ...